BioCision ThawSTAR Скачать руководство пользователя страница 1

1

4

2

5

3

6

ThawSTAR

 Quick Start Guide

Unit is warmed up and in “ready” state. Insert a clean, 
tightly capped frozen 1.8 - 2.0 mL cryogenic vial (below 
-70°C) containing 1.0 mL volume into the opening on 
the top of the unit.

Upon power-up of unit, please allow 5 minutes for instrument warm-up.

Countdown of the last 10 seconds of the thawing 
process begins.

Push the top of the vial down gently until the unit 
emits a deep dual tone. The vial will now remain in 
a depressed position.

Upon thaw completion, the vial is raised 
approximately 1 cm (0.4 in).

Beginning of solid to liquid phase change is detected  
by unit.

Remove vial immediately and for a few seconds, manually 
agitate the vial gently from side to side to equilibrate the 
liquid temperature until no ice can be seen within the vial. 
Begin downstream protocol. 

Отзывы: