GENERAL NOTES 

 

1.

 

GENERAL 

The treatment system is complete with all needed equipment as shown on the drawings and specified therein. 

The following equipment is provided by BioMicrobics, Inc. with purchase of the system: (a) the FAST® system 

sub-assembly, (b) either the foot top and foot bottom or lid, (c) the blower assembly, and (d) blower controls 

and alarms. All other items needed for installation and operation are not included. 

 

The contractor will install the FAST® treatment system as manufactured by BioMicrobics, Inc. The contractor will 

ensure the proper fabrication of the tank, coordinate between the tank suppliers and FAST® system suppliers, 

arrange delivery to the job site, and oversee the installation of the FAST® unit. The tank must provide adequate 

pump-out access and must conform to local, state, and all other applicable codes. The tank must also be level 

within ±1/2 in [12 mm]. 

 

2.

 

MEDIA 

The FAST® media is made of rigid PVC, polyethylene, or polypropylene, and it is supported by the 

polyethylene insert. The media will be fixed in position and contain no moving or wearing parts, and it 

will not corrode. The media has been designed, and will be installed, to ensure that sloughed solids 

descend through the media to the bottom of the septic tank for easy cleanout. 

 

3.

 

REMOTE MOUNTED BLOWER 

The blower must be set in a dry, stable place, and its elevation must be higher than the normal flood 

level. A two-piece, rectangular housing is included with the unit. The discharge air line from the blower 

to the FAST® system is not included and must be provided and installed by the contractor. 

 

4.

 

ELECTRICAL 

The electrical source should be within 150 ft [45 m] of the blower; consult local codes for longer wiring 

distances. Wiring distances must prevent significant voltage loss. All wiring must conform to all 

applicable codes (IEC, NEC, etc.). All conduit and wiring must be supplied by the contractor. 

 

5.

 

CONTROLS 

The control panel, which provides power to the blower, comes with an alarm system consisting of a 

visual and audible alarm that will indicate blower circuit failure and high motor load. The control panel 

is equipped with an SFR® (Sequencing Fixed Reactor) timed control feature. A manual silence button is 

included. 

 

6.   INSTALLATION AND OPERATING INSTRUCTIONS 

Written instructions for proper installation, use, and service of the FAST® system (manuals) are 

included with the product and are available online at the BioMicrobics website. Installation of the 

FAST® system must be carried out in accordance with the written instructions provided in the 

Installation Manual. Moreover, all work related to the installation must be done in accordance with 

local codes and regulations.  

 

 

 

 

 

Содержание HighStrengthFAST 1.0

Страница 1: ...ervice Manual For use with MicroFAST 0 5 0 625 0 75 0 9 1 5 3 0 4 5 9 0 MyFAST 1 0 HighStrengthFAST 1 0 1 5 3 0 4 5 9 0 NitriFAST 0 5 0 625 0 75 0 9 1 5 3 0 4 5 9 0 Service Manual FASTSM 001 REV 30 JU...

Страница 2: ...2...

Страница 3: ...SLUDGE DEPTH 8 TANK PUMPING PROCEDURE 9 SEASONAL INTERMITTENT USE 9 BLOWER REPLACEMENT 10 Blower Removal 10 Blower Installation 11 CLEANING THE BLOWER FILTER 11 Blower Filter Removal 11 Blower Filter...

Страница 4: ...ulate in the bottom of the tank for periodic removal The FAST assembly consists of two components the treatment module and blower The blower provides air to the system via the air supply pipe The air...

Страница 5: ...he septic tank for easy cleanout 3 REMOTE MOUNTED BLOWER The blower must be set in a dry stable place and its elevation must be higher than the normal flood level A two piece rectangular housing is in...

Страница 6: ...NSTALLATION OPTION LID INSTALLATION OPTION Only available for model sizes 0 5 through 3 0 on all FAST systems NOTE These images show equipment that is not supplied by BioMicrobics See Installation Man...

Страница 7: ...amaging substances into the FAST system may void the warranty For list of prohibited or limited use substances see the Owner s Manual NORMAL OPERATING CONDITIONS SOUND The FAST system s blower makes a...

Страница 8: ...bris Clean by using built in plunger WATER QUALITY Effluent should be clear and odorless All FAST systems are capable of exceeding the USEPA standard for secondary wastewater treatment 40CFR part 133...

Страница 9: ...solids so they can be effectively pumped out of the tank 4 Once the unit has been pumped out immediately refill the tank with clean water to reduce the risk of the tank floating and to minimize the i...

Страница 10: ...odily injury or death 2 Remove blower housing cover by unscrewing the mounting bolts and lifting the lid off the blower housing base 3 Remove the motor conduit box cover on the blower motor by unscrew...

Страница 11: ...ower using the correct scheme as noted on the inside of the motor conduit box cover 7 Insulate the wires and fit them inside the conduit box in a professional manner 8 Attach the conduit box cover to...

Страница 12: ...ng service prior to performing any work All electrical work shall be properly performed by a qualified electrician per all applicable codes Failure to do so may result in severe bodily injury or death...

Страница 13: ...n FAST tank The FAST tank is flooded Determine cause of flooding e g line obstruction lateral field pump failure high flows etc Blower motor is making a loud whining or grinding noise Blower motor bea...

Страница 14: ...of labor and all other expenses resulting from replacement of the defective parts and from installation of parts furnished under this warranty shall be borne by the owner This warranty does not cover...

Страница 15: ...ial Number ________________________ System Designer Name _____________________________ Designer Phone ___________________________________ Installed By ______________________________________ Installer...

Страница 16: ...nother bottle C Dissolved oxygen DO and pH meters may be used If you use them they must be calibrated at the site using the manufacturer s required techniques D A sludge measurement device such as a S...

Страница 17: ...es place the collection container into the stream of effluent and rinse any collection containers including sample bottles that will contain effluent DO NOT rinse TKN and ammonia sample bottles that c...

Страница 18: ...ture in the logbook along with the date address and time K Take the sample bottles and place them into the cooler with the wet ice The bottles should be well covered by the ice in order to facilitate...