UF V (E3) 09/2018
Page 30/116
4. Installation and connections
4.1
Operating instructions
Depending on the application and location of the chamber, the operator of the freezer must provide the
relevant information for safe operation of the chamber in a set of operating instructions.
Keep these operating instructions with the chamber at all times in a place where they are
clearly visible. They must be comprehensible and written in the language of the employees.
4.2
Spacers for rear wall distance
Please fix both spacers with the supplied screws at the chamber rear. This serves to ensure the pre-
scribed minimum distance to the rear wall of 100 mm /
3.94
in
.
Figure 15: Spacer for rear wall distance
Figure 16: Rear UF V 700 with mounted spacers
Содержание ULTRA.Guard UF V 500
Страница 106: ...UF V E3 09 2018 Page 106 116 27 7 Dimensions UF V 500 E3 Dimensions in mm...
Страница 107: ...UF V E3 09 2018 Page 107 116 27 8 Dimensions UF V 700 E3 Dimensions in mm...
Страница 108: ...UF V E3 09 2018 Page 108 116 28 Certificates and declarations of conformity 28 1 EU Declaration of Conformity...
Страница 109: ...UF V E3 09 2018 Page 109 116...
Страница 110: ...UF V E3 09 2018 Page 110 116 29 Product registration...
Страница 117: ......