KBF-S (E6) 08/2018
page 22/88
For detailed information on operating the water treatment system BINDER Pure Aqua Ser-
vice and its function, please refer to the operating manual supplied with BINDER Pure Aq-
ua Service.
4.1.3 Installation of freshwater supply
To install the freshwater can proceed in the following order:
1.
Fill the freshwater can.
As long as no hose is connected to the tap of the freshwater can, the tap must
be closed
Observe water quality and temperature (chap. 4.1.1).
For refilling later, you can remove the freshwater can from the support or fill it
on site with a suitable aid (water hose, watering can). When filling on site, the
existing hose connection can remain on the freshwater can.
Figure 7: Freshwater can with closed tap
2.
Establish the hose connection to the freshwater can
The freshwater hose (2 mm wall thickness) is firmly connected to the chamber. Attach the free
hose end to the connection of the freshwater can and secure it at the top and bottom with the 2
supplied hose clamps.
3.
Attach the can support
mounting plate at the left side of the climatic chamber
Loosen 4 screws on the
chamber’s rear panel,
attach the can support
mounting plate and tighten
the screws again.
Screws
Figure 8: Attaching the
can support mounting
plate
4.
Attach the can support to the can support mounting plate
Insert the four hooks of the can support into
the provided eyelets of the can support holder
Figure 9: Attaching the can support to the can
support mounting plate
Содержание KBF-S 240
Страница 75: ...KBF S E6 08 2018 page 75 88 24 7 Dimensions Dimensions size 240...
Страница 76: ...KBF S E6 08 2018 page 76 88 Dimensions size 720...
Страница 77: ...KBF S E6 08 2018 page 77 88 25 Certificates and declarations of conformity 25 1 EU Declaration of Conformity...
Страница 78: ...KBF S E6 08 2018 page 78 88...
Страница 79: ...KBF S E6 08 2018 page 79 88...
Страница 81: ...KBF S E6 08 2018 page 81 88...
Страница 82: ...KBF S E6 08 2018 page 82 88 26 Product registration...
Страница 89: ......