MK LIT (E5) 01/2021
page 47/172
8.2 Guidelines for safe lifting and transportation
The front castors of the chamber can be blocked by brakes. Please move the chambers with castors only
when empty and on an even surface, otherwise the castors may be damaged. Mount the upholstered steel
L-type profile at the lower door locking. After operation please observe the guidelines for temporarily de-
commissioning the chamber (chap. 29.2).
CAUTION
Risk of injury and damages by lifting heavy loads and by sliding or tilting of the
chamber due to improper transportation.
Injuries, damage to the chamber.
∅
Do NOT lift or transport the chamber using the door, the handle or at the lower hous-
ing.
∅
Do NOT lift the chamber by hand.
Transport the chamber only in its original packaging.
Secure the alternating climate chamber with transport straps for transport.
Keep the chamber in upright position.
Place the chamber using technical devices (fork lifter) on the transport pallet. Set the
fork lifter only from the rear in the middle of the chamber. Make sure to place all the lat-
eral supports of the chamber on the forks.
Transport the chamber with the original transport pallet. Set the fork lifter ONLY to the
pallet. Without the pallet the chamber is in imminent danger of overturning.
•
Permissible ambient temperature range during transport: -10 °C /
14 °F
to +60 °C /
140 °F
.
You can order transport packing and pallets for moving or shipping purposes from BINDER service.
8.3 Storage
Intermediate storage of the chamber is possible in a closed and dry room. Observe the guidelines for tem-
porary decommissioning (chap. 29.2).
•
Permissible ambient temperature range during storage: -10 °C /
14 °F
to +60 °C /
140 °F
.
•
Permissible ambient humidity: max. 70 % r.h., non-condensing
When after storage in a cold location you transfer the chamber to its warmer installation site, condensation
may form. Before start-up, wait at least two hours until the chamber has attained ambient temperature and
is completely dry and the oil in the compressors has warmed up.
In case of a prolonged temporal decommissioning: Leave the chamber door open or remove the access
port plugs.
8.4 Location of installation and ambient conditions
Set up the chamber on a flat, even and non-flammable surface, free from vibration, and in a well-ventilated,
dry location and align it using a spirit level. The site of installation must be capable of supporting the cham-
ber’s weight (see technical data, chap. 30.4). The chambers are designed for setting up inside a building
(indoor use).
When after storage in a cold location you transfer the chamber to its warmer installation site, condensation
may form. Before start-up, wait at least two hours until the chamber has attained ambient temperature and
is completely dry and the oil in the compressors has warmed up.
Содержание 9020-0402
Страница 159: ...MK LIT E5 01 2021 page 159 172 30 7 Dimensions LIT MK 240 dimensions mm...
Страница 160: ...MK LIT E5 01 2021 page 160 172 LIT MK 720 dimensions mm...
Страница 161: ...MK LIT E5 01 2021 page 161 172 31 Certificates and declarations of conformity 31 1 EU Declaration of Conformity...
Страница 162: ...MK LIT E5 01 2021 page 162 172...
Страница 163: ...MK LIT E5 01 2021 page 163 172...
Страница 165: ...MK LIT E5 01 2021 page 165 172...
Страница 166: ...MK LIT E5 01 2021 page 166 172 31 3 Safety concept certificate from T V S d...
Страница 173: ......