Billyoh EZE BASE Скачать руководство пользователя страница 1

                                                                  

 

EZE BASE’ INSTRUCTIONS 

 

BillyOh.com – Grassthorpe Road – Sutton on Trent – Newark – Nottinghamshire – NG23 6QX – Tel. 0870 777 8891 

 

THE BILLYOH EZE BASE

 

*Tape measure not included. 

 

BUILDING ASSEMBLY 

     

STEP BY STEP CONSTRUCTION OF YOUR PRESSURE TREATED EZE BASE

 

 

STEP 1:

 MEASURING YOUR SHED PRIOR TO ASSEMBLY OF ‘EZE BASE’ 

Measure the length of the building which is to be mounted on the Eze Base and transfer these dimensions to the 

two outers supplied. Mark accordingly and trial fit with the floor of the building. 

 

STEP 2:

 LAYING OUT ALL PARTS 

Lay all parts of the Eze Base in their intended place as 
demonstrated by the illustration (right). This is to ensure that 
the stretchers can be placed equally apart as to support a 
building most effectively and to check that all parts have been 
received.

 

 
 

 

 
 
 
 

‘L’ bracket 

Corner anchors 

Stretchers 

Outer 

Отзывы: