background image

9

BORÅS

 

Tel +46 (0)33 - 23 67 80      

STOCKHOLM

 

Tel +46 (0)8 - 54 55 12 70

EI90

Fire damper BSKC9

1.   Make a hole for size in question (d + 5 mm).

2.   Apply fire sealant on the wall, 20 mm around the 

 periphery of the hole.

3.   Secure the installation kit flat and tight to the wall. 

4.   Seal joints between the installation kit and duct with fire 

sealant.

5.   Fit the metal union piece over the red decal on the 

cover of the damper. 

6.   When installing without a duct connection, the  damper 

should be fitted with an incombustible grille. The 
 minimum distance between the open damper blade 
and grille should be 50 mm.

Installation in horizontal ducts for size up to Ø315.

Damper’s fire resistance class: EI90 (ve ho i <–> o) S.

EC certificate 0402-CPR-SC0051-19

7.   Insulate the duct, from the hole in the wall to the 

actuator of the damper. Insulate the duct system EI90 
according to the supplier’s instructions. 

8.   The duct system is fitted in accordance with current 

 requirements. Ensure that suspensions and duct 
 systems do not affect the shape of the damper or 
impede the movement of the damper blade.

•  Dampers for installation in duct systems,  

size Ø100 - Ø315.  

•  The shortest distance between dampers must be 

200 mm.

•  The minimum distance to the connecting structure 

should be 75 mm.

•  Free position on damper spindle.

d+5

Installation kit* is mounted on the 

same side as the fire damper

Suspension with 
union piece

Screw 5x65 mm

Seal acc. to section 2 and 4.

Min. thickness 95 mm

Duct

Duct

Installation instructions

190121.0001_ENG / Jan. 2022   teamfr

ont.se

* Installation kit (sleeve rings and union piece)

* Installation kit (sleeve rings)
  Ø100-315 = 3 parts with 3 screws in each
  Ø400-630 = 4 parts with 4 screws in each

Содержание BSKC9

Страница 1: ...18 01 2022 www bevent rasch com BSKC9 Circular fire damper FIRE SAFETY...

Страница 2: ...ts from the smoke detector This must be fitted in the ventilation duct near the damper or in another suitable location Smoke detectors are monitored by means of Bevent Rasch s monitoring sys tem or th...

Страница 3: ...8 dampers RCKD RD Smoke detectors RCTU RCTC MRB3 system max 236 dampers FENIX2 max 2 dampers FENIX4 FENIX max 16 dampers Specification Installation options for BSKC9 Size Fire class Wall of drywall E...

Страница 4: ...ings Union piece Illustrated in de energised state Wiring diagram Tf1 Tf2 BAT72 Actuator S N L1 M 1 2 1 2 3 4 5 6 5 80 Thermal sensor Acuator Actuator type BFL BFN Sizing max 4 VA 6 VA Running time mo...

Страница 5: ...0 1000 100 45 50 55 60 Air flow l s Total pressure drop Pa Sound power level LW dB 1 10 100 200 10 1000 100 45 50 55 60 65 Air flow l s Total pressure drop Pa Sound power level LW dB 1 10 100 200 10 1...

Страница 6: ...wer level LW dB 1 10 100 200 100 1000 3000 50 55 60 65 Air flow l s Total pressure drop Pa Sound power level LW dB Correction of sound power level LWok in octave band Lwok Lw Kok Sound data Correction...

Страница 7: ...ade and grille should be 50 mm Installation in wall fire resistance class EI90 Damper s fire resistance class EI90 ve ho i o S EG certificate 0402 CPR SC0051 19 6 The duct system is fitted in accordan...

Страница 8: ...installing without a duct connection the damper should be fitted with an incombustible grille The minimum distance between the open damper blade and grille should be 50 mm 6 The duct system is fitted...

Страница 9: ...late the duct from the hole in the wall to the actuator of the damper Insulate the duct system EI90 according to the supplier s instructions 8 The duct system is fitted in accordance with current requ...

Отзывы: