background image

1

SEQUENCE OF OPERATION

RECOMMENDED LOCATION

TEMPERATURE AND SAFETY REQUIREMENTS

HUMIDIFIER MOUTING LOCATION

Installation Instructions 

Owner’s Manual

STEP BY STEP INSTALLATION

DRILL MOUNTING HOLES AND CUT OPENING  

MODEL GH2500

MOUNTING HUMIDIFIER

HUMIDISTAT MOUNTING LOCATION

MODEL GH2500 SCOOP HUMIDIFIER

Refer  to  the  rating  plate  on  the  furnace  for  minimum 
clearances  to  combustible  construction.   All  parts  and 
connections  of  a  BestAir  PRO  humidifier  must  be 
installed  outside  of  the  minimum  clearance  require-
ments for rear, top, sides, and flue of furnace.  Do not 
install  where  humidifier  or  water  connections  may  be 
exposed  to  freezing  temperatures  or  outside  weather.  

Attic installations are NOT recommended.

  If you have 

central air conditioning, carefully plan the location of the 
plenum opening to prevent damage to the cooling coil or 
other components inside the duct.

The BestAir PRO model GH2500, is to be mounted on 
the supply duct of the furnace only.

The  BestAir  PRO  Model  GH2500  use  the  evaporative 
principal to add moisture to the warm air heating system.  
Upon a demand for humidity from the humidity control, 
the water solenoid valve opens and water flows in at the 
top  of  the  media  pad  and  is  evaporated,  as  warm  air 
passes  through  the  media  pad.    When  the  moisture 
laden air re-enters the duct it is mixed with dry air already 
flowing through the duct.  This moisture laden air gradu-
ally increases the relative humidity level in the home.

CAUTION

:

  

Installation should be performed by 

qualified  personnel  only.    Use  eye  protection  and 
gloves when drilling and handling sheet metal.  All work 
must be performed to local & national codes and ordi-
nances.  Use multi-conductor 18 awg solid copper wire. 
Provide  over-current  protection  as  required.  DO  NOT 
omit the drain or overflow tubing.

Turn  off  power  to  the  furnace  before  installing  the 
humidifier.  Test fit the GH2500 housing on the side of 
the  warm  air  plenum.    Before  proceeding,  verify  that 
adequate  clearances  are  available  for  servicing  the 
media pad.  There must also be adequate room (5 1/2 
inches) inside the plenum for the louver.  If necessary, 
relocate the unit.  Use a plumb line or a level to make 
sure  the  housing  is  level.    With  a  permanent  marker 
outline the inside edge of the housing.  Also mark the 
twelve  holes  to  be  drilled.    Center  punch  and  drill  all 
twelve holes as indicated by the marks.  Drill or punch 
a starter hole and then use tin snips to cut out the rect-
angular  shaped  opening.   The  opening  should  be  1/8 
inch larger on all four sides than what was marked.

Hold the housing next to to duct and start four #8 x 3/4 
inch long sheet metal screws through the holes in the 
bottom edge of the humidifier.  With these four screws 
started  the  unit  should  remain  in  place  while  starting 
the other eight screws.  With all twelve of the screws 
started they can now be tightened.  With the housing 
mounted  the  louver  can  be  installed.   This  should  be 
done  by  rotating  the  louver  to  the  proper  position 
depending  on  the  direction  of  air  flow.    The  air  flow 
should enter into the curved multi-louvers and exit out 
of the large opening.

The  humidistat  can  be  mounted  on  the  cold  air  return 
duct to sense the cool dry air returning to the furnace.  It 
can also be mounted on an interior wall near the furnace 
thermostat as well.  The electrical connections and basic 
wiring  are  the  same  for  duct  mounted  or  wall  mounted 
humidistats.

TB 218 Part#090375A0218-GH

12122006GH2500

FOR USE WITH GAS, OIL, and HYDRONIC FORCED AIR FURNACES

®

Copyright 2007 ©                   , All Rights Reserved

  281 Keyes Ave. Hampshire, IL 60140 • 847-683-7990 • Fax 847-683-7301 • www.bestairpro.com

®

TM

GH2500 mounts
to the supply
duct only.

Horizontal flow

GH2500

Blower
 Motor

Side Cutaway View
Model GH2500 mounted
on the supply plenum
of an Upflow Furnace

Up Flow

GH2500

Содержание GH2500

Страница 1: ...tubing Turn off power to the furnace before installing the humidifier Test fit the GH2500 housing on the side of the warm air plenum Before proceeding verify that adequate clearances are available for...

Страница 2: ...ual ADDITIONAL RECOMMENDED PARTS 1 Relay with 120 volt current sensing coil for furnaces with multi speed blower motors 2 4x4 wire box to mount transformer and enclose line voltage connections 3 18awg...

Страница 3: ...nsformer to the humidistat Then from the humidistat to the other wire on the solenoid valve Make sure not to route wires where they can be burned or chaffed See example wiring solutions to the right o...

Страница 4: ...black mark on the edge of the pad indicates the top The pad slides into the door and rests against the four legs located inside Position the bottom edge of the door in the tray located on the lower o...

Страница 5: ...Y CHART Suggested Humidistat Settings OUTDOOR TEMPERATURE ADJUST RH TO 30 F 20 F 10 F 0 F 9 F 40 35 30 25 20 Table 1 Suggested RH set points for different outdoor temperatures All power humidifiers re...

Страница 6: ...bris RH level in the home is low or will not rise 1 Humidity control is set to low 2 Water supply has been turned off 3 Media pad is clogged with mineral buildup 4 Media panel is installed incorrectly...

Страница 7: ...7 SERVICE NOTES Copyright 2007 All Rights Reserved 281 Keyes Ave Hampshire IL 60140 847 683 7990 Fax 847 683 7301 www bestairpro com...

Страница 8: ...8 SERVICE NOTES Copyright 2007 All Rights Reserved 281 Keyes Ave Hampshire IL 60140 847 683 7990 Fax 847 683 7301 www bestairpro com...

Отзывы: