background image

14

Phase Check 

(for Electricians Only)

When you have made all of the terminal strip connections (and installed the external batteries if the UPS has
them), complete this phase check. You will need an AC voltmeter.

1.

Make sure the main circuit breaker in the load service panel is off, or make sure the loads cannot receive
power from the UPS. 

2.

Make sure the bypass switch is in the "OFF" position.

3.

At the UPS AC input service panel, turn on the input power to the UPS and the bypass switch. 

4.

Next, turn the AC Disconnect switch on. The AC LINE light on the UPS will light.

If your UPS does not have a separate battery cabinet, follow Section 305 on page 11.

5.

Turn the B610 On/Off switch on. (See Section 400 on page 20.) 

6.

Turn the bypass switch to "UPS."

7.

Make sure the voltage from the UPS to the loads is close to the voltage from AC line to the bypass
switch. (There may be slight differences.) 

•Find the measurement points for your bypass switch type (internal or external) and model on

the next page. 

•Use an AC voltmeter to measure the voltage between these points on the terminal strip. (See

the terminal strip label.) 

•Record the voltage measurements for your bypass switch in the spaces provided below.

BPE-02, 04, or - 05:

AC from UPS Output

AC Line Input

7 to 8 ________ VAC

11 to 12 _______ VAC

6 to 7 ________ VAC

10 to 11 _______ VAC

6 to 8 ________ VAC

10 to 12 _______ VAC

The voltages written in the first column should be similar to the voltages in the second column.
(They may be slightly different.) If voltages are more than a few volts apart, check the terminal
strip connections and correct any wiring problems. If you need help, call Best Power's
Worldwide Service or your local Best Power office.

Important:

If the AC Input voltage is 208 volts, you will normally measure 104 volts AC between
the following AC output terminals:

External Bypass Switches:

(6 and 7) and (6 and 8)

Do not connect any 120-volt load to the 104-volt terminals.

CAUTION

Before changing the bypass switch from OFF to UPS or AC Line, check for correct operation by following
the steps below. To prevent damage to the loads (protected equipment), make sure the main circuit breaker
in the load service panel is OFF, or make sure the loads cannot receive power from the UPS.

Содержание B610

Страница 1: ...Best 610 Installation and Operation Manual Single phase Input and Output B6106000U and B610010KU Models LTM 1313C 1999 Best Power All rights reserved...

Страница 2: ...246 Highway 80 P O Box 11 Necedah Wisconsin 54646 U S A Telephone 1 608 565 2100 Toll free 1 800 356 5737 U S and Canada FAX 1 608 565 2509 International Service Fax 1 608 565 2799 Best Power Technolo...

Страница 3: ...and Compliance 29 1000 Warranty 30 100 Introduction Thank you for choosing the Best 610 B610 This manual explains how to install and operate the UPS interpret its status LEDs and communicate with the...

Страница 4: ...ge 5 Note The front panel may differ from this drawing Figure 2 Figure 1 Communication Port Battery Breaker Input Breaker Input Fuse Output Breaker BestDock with Best Relay AS 400 Card Conductor Box C...

Страница 5: ...age at the UPS output this is true because the UPS can supply output power from the input source or its batteries To avoid equipment damage or personal injury always assume that there is voltage at th...

Страница 6: ...m or container 304 AC Installation The UPS installation must be performed by qualified personnel according to local codes and regulations 1 Find the UPS ID label on the back panel and note the model n...

Страница 7: ...t adapters AC input and AC output conductors must be run through separate conduit UPS output circuits shall be installed in dedicated conduit systems and not shared with other electrical circuits 6 Us...

Страница 8: ...0 units Reattach the cover to the conductor box on the back of the UPS If your unit has one or more external battery cabinets see Section 305 to connect these cabinets For all models go to Section 306...

Страница 9: ...NOTE 3 All circuit conductors including the neutral and equipment grounding conductors must be the same size ampacity and have the same rating 75 C copper wire and be sized according to the input prot...

Страница 10: ...t Power requires the grounding electrode conductor to be the same size ampacity as the largest UPS input circuit conductor See NEC Section 110 3 b Conduit is not considered an acceptable grounding ele...

Страница 11: ...st UPS input circuit conductor See NEC Section 110 3 b Conduit is not considered an acceptable grounding electrode conductor Best Power recommends that you do not route the grounding electrode conduct...

Страница 12: ...re and must be sized according to the input circuit breaker NOTE 5 The customer must provide output overcurrent protection as stated in NEC Section 240 21 or local codes Size the protection device acc...

Страница 13: ...reaker NOTE 5 The customer must provide output overcurrent protection as stated in NEC Section 240 21 Size the protection device according to local code requirements NOTE 6 For maximum protection agai...

Страница 14: ...asure the voltage between these points on the terminal strip See the terminal strip label Record the voltage measurements for your bypass switch in the spaces provided below BPE 02 04 or 05 AC from UP...

Страница 15: ...ed equipment is correct 12 Verify the voltage at the Load Distribution Panel see the wiring diagram or the UPS protected receptacles for your equipment 13 Next turn the bypass switch to UPS and measur...

Страница 16: ...27 3 amps 48 0 amps 110 and or 220 27 3 amps 45 5 amps 115 and or 230 26 1 amps 43 5 amps 120 and or 240 25 0 amps 41 7 amps Figure 8 UPS Output Wiring Connections Find the output wiring configuration...

Страница 17: ...ry systems and required precautions must service the batteries A battery can present a risk of electrical shock and high short circuit current Batteries may cause severe injury if the terminals are sh...

Страница 18: ...ve and ground cables that you will use to connect the UPS to the battery cabinet The battery cable or wire that should be used is No 6 AWG 13 30 mm2 If the batteries must be some distance form the UPS...

Страница 19: ...306 Setting the Output Voltage DIP Switch The DIP switch for setting the output voltage is on the back of the UPS next to the communication port The chart below the switch shows the proper settings f...

Страница 20: ...e UPS For this reason the UPS is running on battery power 5 Turn on the output breaker on the UPS back panel This turns on output power to the equipment connected to the UPS During a power failure or...

Страница 21: ...too high 502 Battery Power Inverter and Battery Charge LEDs When the UPS runs on battery backup power inverter the Battery and Inverter LEDs are on as shown This happens during a power outage or when...

Страница 22: ...back to normal operation after the overload has been removed 504 Alarm LED Whenever the red LED at the top of the front panel is on or flashing the UPS has detected a problem The UPS will also sound...

Страница 23: ...ll flash If there is a power outage the UPS will shut down If the Battery LED is off this is a High Ambient Temperature alarm The UPS will sound a constant tone If the cause of the alarm is the batter...

Страница 24: ...y charged or it may be bad or the charger may have failed Recharge the battery for at least 10 hours by connecting the UPS to a source of AC line input Then retest the battery backup time If the probl...

Страница 25: ...ower outages To use the software follow the instructions in the installation section to connect the cable to the UPS Then follow the instructions on the CheckUPS CD jacket to install CheckUPS software...

Страница 26: ...e unit allows your UPS to work smoothly with an AS 400 system or to provide voltage free contact closures for use with external alarm circuits Note A plug with a link is supplied on the Best Relay AS...

Страница 27: ...the temperature in the UPS location between 15 C and 55 C 5 F and 131 F The batteries in the UPS must be recharged every 90 120 days Recharge the batteries more often if you store the unit at temperat...

Страница 28: ...C 26 1 A 115 VAC 52 2 A 240 VAC 25 0 A 120 VAC 50 0 A 208 VAC 48 0 A 104 VAC 96 0 A 220 VAC 45 5 A 110 VAC 91 0 A 230 VAC 43 5 A 115 VAC 87 0 A 240 VAC 41 7 A 120 VAC 83 4 A Efficiency AC to AC 85 at...

Страница 29: ...onic overload and short circuit protection thermal shutdown automatic shutdown at low battery voltage and overvoltage protection for I P 906 Batteries and Battery Charger Battery type Batteries are se...

Страница 30: ...air or replace the product to conform to this warranty after a reasonable number of attempts BEST POWER will refund the purchase price Remedies under this warranty are expressly limited to those speci...

Страница 31: ...hazards accident fire or other casualty misuse negligence incorrect wiring and any use or installation not in conformance with instructions furnished by BEST POWER or repairs or replacements needed b...

Страница 32: ...al may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct t...

Страница 33: ...ration Best Power Model Number___________________________ Best Power Serial Number ___________________________ I acknowledge that the above product has been properly installed and grounded in accordan...

Отзывы: