Optional Roof Covering
,i
@%$<
(B77A()2#&'$+3
^
863<
(B77A(.%:#8.(N%'+G,0.
Step 26B
Install Doors continued
Install Roofing — Not Supplied in Kit
-<
C5&'(;2+(7;2+:(%77:<(I:74(;2+(#&3#%+(7A(@"#$%#&'(6$73+(@7;2(%77:3<(R&(;2+(:#'2;(%77:?(#&3;5$$
5(3$#%#&'(%77:($5;62(5;(;2+(@7;;74(7A(-/_(A:54+<(]7"(>#$$(&++%(;7(%:#$$(5(27$+(#&(;2+(A$77:(A7:
;2+(:7"&%(325A;(;7(%:78(#&;7<
i<
b&3;5$$(5(4+;5$(8$5;+(;7(;2+($7>+:(@56O(7A(7;2+:(%77:<(12+(5&'$+%(+&%(>#$$(O++8(@7;2(%77:3
5$#'&+%(>2+&(6$73+%<
_<
I:74(;2+(7";3#%+(#&3;5$$(;2+(%77:(25&%$+3(5&%($76O#&'(%77:(2538(7&(;2+(7";3#%+(7A(;2+(%77:3<
Angled
Metal Plate
Drill Hole
Fold Hasp to
Cover Screws
,<
b&3;5$$(4+;5$(:77A(.%:#8.(+%'#&'(5$7&'(;2+(8+:#4+;+:(7A(;2+(:77A<
-<
b&3;5$$(A+$;(858+:(5&%(32#&'$+3(5667:%#&'(;7(45&"A56;":+.3(#&3;:"6;#7&3<
Roof Sheathing
1x6
Trim
Metal Roof Edge