LB 478 MPLM
5 Electric Installation
56925-8BA2 Rev.00, 07/2019
29
u
the cables are laid out in a strain-relieved and friction-free manner.
u
Only use cables whose diameters are approved for the respective cable gland.
The cables must comply with the requirements and cross-sections specified in
the technical data.
u
The connected cables must be appropriate for temperatures of at least 10°C
above the maximum admissible ambient temperature.
Cable Glands and Blanking Elements
u
The feeding of cables into the wall housing is only permitted via a cable entry.
u
Cable glands must be suitable for the respective application.
u
All cable glands must be assembled according to manufacturer's instructions
and be tightened to the appropriate tightening torque.
u
Cable glands that are not required for installation must be covered with suit-
able blanking elements.
u
Line cross-sections must comply with the respectively used cables.
u
Cable bushings and blanking elements must comply with the applicable IP pro-
tection class and with the requirements for the operational environment.
u
We recommend ordering missing cable glands, blanking elements or adapters
from Berthold.
Protective earth and equipotential bonding
u
The protective earth conductor has to be connected to the terminals marked
with "PE".
u
The housing must be connected to local equipotential bonding.
EIA-485 (RS-485) Network
For integration of EVU units into an EIA-485 (RS-485) network, all participants must
be connected one after the other in the configuration Master-Master. Star connec-
tion is not permitted.
The first and last station (physical, independent of the master's position) on the
network needs a terminating resistor of 121 Ω.
Содержание Duo Xpert LB 478 MPLM
Страница 2: ......
Страница 4: ......
Страница 12: ...1 About this Operating Manual LB 478 MPLM 12 56925 8BA2 Rev 00 07 2019...
Страница 16: ...2 Safety LB 478 MPLM 16 56925 8BA2 Rev 00 07 2019...
Страница 26: ...4 Installation LB 478 MPLM 26 56925 8BA2 Rev 00 07 2019...
Страница 34: ...5 Electric Installation LB 478 MPLM 34 56925 8BA2 Rev 00 07 2019...
Страница 40: ...6 Operation of the Software LB 478 MPLM 40 56925 8BA2 Rev 00 07 2019...
Страница 74: ...7 Main Menu Device Setup LB 478 MPLM 74 56925 8BA2 Rev 00 07 2019...
Страница 88: ...9 Troubleshooting LB 478 MPLM 88 56925 8BA2 Rev 00 07 2019...
Страница 94: ...10 Maintenance and Repair LB 478 MPLM 94 56925 8BA2 Rev 00 07 2019...
Страница 109: ...Unit d valuation D tecteurs LB 47x LB 4700 Informations sur la s curit 56925BA59 Rev No 03 05 2019...
Страница 119: ...EmulsionSENS Technical Information Technische Information 56925TI1M Rev No 00 07 2019...
Страница 130: ...Technical Information EmulsionSENS Technische Information EmulsionSENS 56925TI1M Rev 00 07 2019...