54733-10BA2L
3 – 318
02.2017
Menu Structure
Volume 3
2.9
Quick Start, Step 2
1 Time Constant
The time constant smoothes the output signal. Statistical fluctua-
tions, as well as level fluctuations due to the process, e.g. by agita-
tors, are smoothed. A time constant of 20 s is usually reasonable.
2 Nuclide
Enter here the isotope (nuclide) that is used in your source:
•
Co-60
•
Cs-137
•
USER DEFINED
This entry controls the automatic decay compensation. The correct
entry is also important in a single-point calibration and for gas den-
sity compensation. The isotope used is listed on the type plate of
the shielding and on your delivery documents. The item
USER
DEFINED
allows you to use any isotope you want. In this case,
additional parameters are requested: Specify the half-life under
Half Life Time
and the absorption coefficient at
Absorption
.
What happens when you have selected the wrong isotope?
As a result of the wrong decay compensation, you will get a deviat-
ing display only after several weeks or months, with the deviation
increasing over time. If you perform a calibration with the gas den-
sity compensation GDA, or a 1-point calibration, the wrong isotope
will also calculate wrong calibration data.
3 ReadIn Time
Here you can define the period of time over which the count
rate is to be read-in for each calibration point.
The statistical variation of the count rate is averaged over this time
period. The longer it is, the better the mean value. A time period of
30 s (default setting) is usually reasonable.
Содержание LB 480
Страница 2: ......
Страница 3: ...1 2 3 Volume 1 Safety Manual Volume 2 Installing SENSseries Volume 3 Operation with HART Communicator...
Страница 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Страница 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Страница 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Страница 55: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 55 Volume 1 5 Explosion Protection 1 5 9 ATEX Certificate...
Страница 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Страница 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Страница 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Страница 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Страница 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Страница 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Страница 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Страница 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Страница 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Страница 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Страница 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Страница 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Страница 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Страница 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Страница 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Страница 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Страница 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Страница 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Страница 109: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 7 Functional Safety 1...
Страница 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Страница 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Страница 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Страница 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Страница 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Страница 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Страница 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Страница 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Страница 254: ...54733 10BA2L 2 254 02 2017 5 Technical Information Volume 2 LB 480 Dimensions in mm Abmessungen in mm...
Страница 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Страница 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Страница 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Страница 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Страница 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Страница 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Страница 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Страница 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Страница 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Страница 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Страница 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...