
54733-10BA2L
2 – 224
02.2017
3 Electrical Installation
Volume 2
Fig. 3-4
Detector housing with connection head
Connecting cables
Unscrew the housing cover (M5 and M8 Allen wrench).
Remove the sealing plug on the bushings that you need for your
cable entry.
Install the screwed cable gland or for FM/CSA a conduit system
with a conduit seal before the cable entry into the terminal
compartment.
IMPORTANT
In Ex-protected areas, use only cable glands that are approved for
your explosion protection.
Pull the connection cables with the complete external insulation
through the cable entry into the terminal compartment.
Make sure that the cable diameter of the cable used is suitable
for the screw connection.
Make sure when installing the cables that mechanical damage
to the conductor insulation from sharp edges or moving metal
parts will be ruled out.
Keep the cable length long enough to create a cable loop for
strain relief before the housing inlet.
Do not unscrew the 6 screws
connecting the detector
housing to the connection
head.
Detector housing
Housing cover
Connection head
Содержание LB 480
Страница 2: ......
Страница 3: ...1 2 3 Volume 1 Safety Manual Volume 2 Installing SENSseries Volume 3 Operation with HART Communicator...
Страница 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Страница 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Страница 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Страница 55: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 55 Volume 1 5 Explosion Protection 1 5 9 ATEX Certificate...
Страница 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Страница 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Страница 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Страница 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Страница 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Страница 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Страница 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Страница 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Страница 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Страница 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Страница 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Страница 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Страница 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Страница 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Страница 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Страница 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Страница 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Страница 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Страница 109: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 7 Functional Safety 1...
Страница 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Страница 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Страница 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Страница 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Страница 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Страница 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Страница 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Страница 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Страница 254: ...54733 10BA2L 2 254 02 2017 5 Technical Information Volume 2 LB 480 Dimensions in mm Abmessungen in mm...
Страница 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Страница 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Страница 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Страница 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Страница 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Страница 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Страница 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Страница 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Страница 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Страница 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Страница 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...