54733-10BA2L
2 – 208
02.2017
2 Installation
Volume 2
Fig. 2-31 Dip tube installation with point source and point detector
If the shieldings are employed in aggressive atmospheres, the steel
cable or the shaft core and the latch mechanism have to be
checked for corrosion in regular intervals. The intervals between
the checks have to be defined by the operator such that a malfunc-
tion of the mechanism due to corrosion is ruled out.
Version with shaft core
Instead of a steel cable, a shaft core is installed which consists of a
spring wire. This allows you to install flange shieldings to the vessel
from below or from the side and to insert the source from there into
the dip tube and to position it. The shaft core is inserted completely
into the shielding to position the source. The immersion depth of
the source is then fixed by a clamping screw, not with the position-
ing screw. In exceptional cases, it may be necessary, with point
sources, to determine the position accurate to the millimeter to
make sure that the beam path does not hit any vessel installation.
Shielding with
source
Pressure control
Protection gas
Vessel wall
Detector
Dip tube
Protection tube
Содержание LB 480
Страница 2: ......
Страница 3: ...1 2 3 Volume 1 Safety Manual Volume 2 Installing SENSseries Volume 3 Operation with HART Communicator...
Страница 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Страница 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Страница 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Страница 55: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 55 Volume 1 5 Explosion Protection 1 5 9 ATEX Certificate...
Страница 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Страница 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Страница 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Страница 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Страница 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Страница 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Страница 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Страница 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Страница 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Страница 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Страница 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Страница 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Страница 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Страница 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Страница 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Страница 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Страница 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Страница 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Страница 109: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 7 Functional Safety 1...
Страница 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Страница 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Страница 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Страница 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Страница 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Страница 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Страница 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Страница 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Страница 254: ...54733 10BA2L 2 254 02 2017 5 Technical Information Volume 2 LB 480 Dimensions in mm Abmessungen in mm...
Страница 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Страница 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Страница 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Страница 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Страница 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Страница 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Страница 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Страница 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Страница 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Страница 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Страница 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...