Page 35 of 44
17.07.2014
Ver. 3.3
© Berner Kochsysteme 2015
Installation instructions for an flush-mounting frame
(Ver. B) of Berner Induction units
Please observe the following installation instructions. The only way to ensure a trouble
free operation and a long life time. To ignore the following guidelines will void the
warranty.
Make the cut in the surface in accordance with the
installation drawing.
(Please use only detailed
drawings).
Use only suitable materials (stainless steel at
least 3mm or granite).
Install the bolts M6 on the bottom on the surface shown
in the diagram (installation drawing) “mounting frame”.
Install the mounting frame to the bottom.
Important!
Observed tensile strength of the weld stud
and tightness of the screws.
Insert the Induction unit from the top and install the
cables
.
Please follow this regulations: generator coil
separate:
Feeler-, display- and control cables have to be
installed separate from the coil and generator cables and
if it`s possible be covered in a steel channel.
Содержание BI1EG2.5B
Страница 25: ...Page 24 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 Generator Views...
Страница 26: ...Page 25 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 Spare Parts List BIPS Generator...
Страница 27: ...Page 26 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 BIPMS Generator...
Страница 28: ...Page 27 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 BIPDS Generator...
Страница 29: ...Page 28 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 BIPDMS Generator...
Страница 30: ...Page 29 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 Displays in different versions...
Страница 44: ...Page 43 of 44 17 07 2014 Ver 3 3 Berner Kochsysteme 2015 Wiring diagram...