background image

Central mast climbing structure 2900 

 

Berliner Seilfabrik GmbH & Co. 
Lengeder Straße 2/4 
13407 Berlin 
Germany 

Tel.   

 

Fax  

E-mail 

Homepage 


 


+49.(0)30.41 47 24-0 
+49.(0)30.41 47 24-52 or -35 
+49.(0)30.41 47 24-33 
info@ play-connection.com 
www.play-connection.com

 

 

Version: April 2014 

Assembly instructions according to 

DIN EN 1176 2008 

 
 

Page 1 of 11

 

 

 

MOUNTING INSTRUCTION 

 

 

Central mast climbing structure SC 2900 
ART. NO.: 71.200.029.00 

 

 

 

 

Содержание 71.200.029.00

Страница 1: ...y Tel Fax E mail Homepage 49 0 30 41 47 24 0 49 0 30 41 47 24 52 or 35 49 0 30 41 47 24 33 info play connection com www play connection com Version April 2014 Assembly instructions according to DIN EN 1176 2008 Page 1 of 11 MOUNTING INSTRUCTION Central mast climbing structure SC 2900 ART NO 71 200 029 00 ...

Страница 2: ...______________________________ 3 2 Foundations____________________________________________________________ 4 2 1 Foundation construction________________________________________________ 4 2 2 Installation instructions for connection anchors_______________________________ 5 2 2 1 Installation of connection anchor M16 __________________________________ 5 2 2 2 Installation of connection anchor M20 __...

Страница 3: ...y 1 Lever round bar max Ø12 mm length 50 cm or similar 2 Box or open end wrench SW 24 3 Box or open end wrench SW 30 4 Open end wrench SW 36 5 Percussion drilling machine 6 Percussion drill D 18 mm 7 Percussion drill D 25 mm 8 Lubricant grease 9 Commercially available hammer 10 Spade Unavailable required tools can be supplied at a charge 1 3 Packing list 1 Net with mast head and accessories comple...

Страница 4: ... be used is C20 25 The following work steps must be carried out for foundation construction 1 Approximately determine the foundation points on site 2 Excavation of the pit for the foundations according to the specifications from the foundation plan 3 Concrete foundation using concrete with the minimum quality C20 25 4 Allow the concrete to completely hydrate min 2 weeks 5 Create a surface for the ...

Страница 5: ...mering with a drill hammer Mortar coming out of the fixing bore is to be subsequently removed Installation is correct when the setting mark of the anchor rod is flush with the edge of the bore and the ring gap has been completely filled with mortar Hardening times Temperature in Hardening time min Hardening time min the ground C with dry concrete with wet concrete over 20 10 min 20 min 11 to 20 20...

Страница 6: ...ction com Version April 2014 Assembly instructions according to DIN EN 1176 2008 Page 6 of 11 2 2 2 Installation of connection anchor M20 The fixing bores for the connection anchors can be drilled after the markings for the outer foundation points have been set These are drilled Ø25 mm 170mm deep into the foundation with a percussion drilling machine and the percussion drill Proceed as described i...

Страница 7: ...n com Version April 2014 Assembly instructions according to DIN EN 1176 2008 Page 7 of 11 3 Net assembly Attention The fastening components for tensing and holding are already attached to the preassembled net upon delivery Inspection prior to net assembly Dimensions and fit of the foundations based on the foundation plan Fig 1 Foundation points A B C Orientation of the mast foot toward the foundat...

Страница 8: ...y Place the HDPE ring with the chamfer facing down over the pipe onto the slab of the centre foundation Place the crate with the net next to the central foundation tip it over and pull the net in the direction of foundation point A then spread it out The net should now lie on the ground without any twists Guide the mast along the red white marking band through the net structure and then fasten the...

Страница 9: ...hole of the ring nut and the M20 DIN985 2 nut tightened with an SW36 wrench 3 2 Tensing the net Loosen the lock nuts prior to tightening and grease the threads In order to tense the net the turnbuckle is turned on the turnbuckle nut with the help of the lever This results in both fork heads pulling with the winch in the turnbuckle nut and the tensing of the net The gap between the HDPE plates buil...

Страница 10: ...com Version April 2014 Assembly instructions according to DIN EN 1176 2008 Page 10 of 11 3 3 Net tension The net has the correct tension when one positions oneself in the middle of one of the horizontal ropes Fig 3 resulting in a sag of 25 40 mm Fig 4 Principle sketch Fig 3 Sag 25 40mm Weight force of employees Fig 4 Principle sketch of sag Attention Depending upon frequenzy of play the net must b...

Страница 11: ... 30 41 47 24 33 info play connection com www play connection com Version April 2014 Assembly instructions according to DIN EN 1176 2008 Page 11 of 11 4 Final work Upon conclusion of all tensing and assembly work all threaded connections are checked for a tight fit and the marking band is removed All installation aids are then removed from the play area and the play area restored ...

Отзывы: