3. Screw one pedestal onto threaded rigid conduit protruding
from floor.
4. Install remaining pedestal(s) in heater and secure by
installing lock nut finger tight.
5. Install heater onto the pedestal which is screwed on the rigid
conduit. Position heater in desired location and mark
pedestal mounting hole locations on floor. Then remove the
heater and the one pedestal from the rigid conduit.Remove
the remaining pedestal(s) from the heater.
6. Drill holes in floor (Fig. 4b) and install threaded inserts (or
equivalent for 1/4” mounting bolts (inserts and bolts supplied
by installer.)
7. Reinstall the one pedestal on the rigid conduit, then secure
all other pedestals (with cover plates) to the floor with four
1/4” bolts through each pedestal flange.
Pedestal Installation
(Imbedded in New Concrete Floor)
When a heater installation is to be imbedded in a new concrete
floor, the pedestals are first installed in the concrete, then the
heater installed after the concrete has set. It is imperative that
the pedestals be installed in perfect alignment so that the holes
in order to achieve the required alignment, it is recommended
that the pedestals be held in place by the use of jigs during the
concrete pour. The jigs should be constructed of good quality 1”
x 4” lumber as shown in Figure 5. The pedestals are installed in
5
1-7/16” (CPLAS)
1-9/16” (CPLAM)
25-1/8” (CPLAS)
24-7/8” (CPLAM)
28”
28-Inch Heater
1-7/16” (CPLAS)
1-9/16” (CPLAM)
33-1/8” (CPLAS)
32-7/8” (CPLAM)
36”
3-Foot Heater
1-7/16” (CPLAS)
1-9/16” (CPLAM)
45-1/8” (CPLAS)
44-7/8” (CPLAM)
48”
4-Foot Heater
1-7/16” (CPLAS)
1-9/16” (CPLAM)
1-7/16” (CPLAS)
1-9/16” (CPLAM)
1-7/16” (CPLAS)
1-9/16” (CPLAM)
57-1/8” (CPLAS)
56-7/8” (CPLAM)
69-1/8” (CPLAS)
68-7/8” (CPLAM)
93-1/8” (CPLAS)
92-7/8” (CPLAM)
1-7/16” (CPLAS)
1-9/16” (CPLAM)
117-1/8” (CPLAS)
116-7/8” (CPLAM)
76-13/16”
36-13/16”
44-13/16”
32-13/16”
28-13/16”
60”
72”
94”
120”
5-Foot Heater
6-Foot Heater
10-Foot Heater
8-Foot Heater
Locknut
Pedestal
Wooden Jig
Typical Set-Up of Heater
Pedestal Using Jigs To
Maintain Proper Positioning
During Concrete Pouring.
Figure 5.
NOTE: HOLES IN JIGS SHOULD BE
1-3/8” FOR CPLAS HEATERS, OR
1-11/16” FOR CPLAM HEATERS.
* WHEN BUTTING HEATERS,
LEAVE A 1/16” GAP BETWEEN
HEATERS TO ALLOW FOR
EXPANSION.
End Cap Data
Heater Catalog Number
Description
CPLAS
CPLAM
End Cap Left
CPLAS-ECL(R)
CPLAM-ECL(R)
End Cap Right
CPLAS-ECR(R)
ASH07-ECL(R)
(R) Suffix on catalog number refers to accessories with 120 VAC receptacle.
Figure 6.
Housing
End
Cap
End Cap
Mounting
Screws
Accessory
Mounting
Holes
Содержание CPLAM