
57
Commisioning
GB
Measuring the blind/shutter and slat running times
The blind/shutter running time is important for positioning and
scene moves. With Venetian blinds, the slat adjusting time is for
technical reasons part of the overall running time of blinds/shut-
ters. The opening angle of the slats is therefore defined as the
running time required between the ‚open‘ and ‚closed‘ positions.
The upward move is generally longer than the downward move and
is accounted for as running time prolongation in percent.
Measure the ‚up‘ and ‚down‘ running times of the blind/shutter.
Measure the slat adjusting time.
Enter the measured values into the parameter settings list.
Loading the address and the application software
Switch on the bus voltage.
Allocate the physical address and load the application software
into the device.
Содержание 7531 00 01
Страница 4: ...4 Ger teaufbau D 1...
Страница 18: ...18 Anschluss D 3...
Страница 23: ...23 Informationen f r Elektrofachkr fte D 5...
Страница 36: ...36 GB Device components 1...
Страница 50: ...50 GB Connection 3 3...
Страница 55: ...55 GB Information for quali ed electricians 5...
Страница 68: ...68 NL Opbouw van het toestel 1...
Страница 82: ...82 Aansluiting NL 3...
Страница 87: ...87 Informatie voor elektromonteurs NL 5...
Страница 97: ...97 Notes...
Страница 98: ...98 Notes...
Страница 99: ...99 Notes...