background image

19

END USER

Содержание IDRA MS 150 LE

Страница 1: ...Installation and Operation Manual Solar Solar storage cylinder IDRA MS 150 LE Installation and Operation Manual EN ...

Страница 2: ...nt instructions and precautions that must be observed to ensure the trouble free installation and efficient functioning of your B solar storage cylinder Please accept our renewed thanks for your purchase Beretta Conformity B storage cylinders conform to DIN 4753 3 and UNI EN 12897 standards CONFORMITY b b This product must only be used for the purpose for which it is designed and made as specified...

Страница 3: ...of sensors 10 9 Overall dimensions and water fittings 11 INSTALLER 12 10 Unpacking the product 12 11 Handling 12 12 Place of installation 13 13 Installation in older systems and systems requiring modernisation 13 14 Preparing for initial startup 13 TECHNICAL ASSISTANCE CENTRE 14 15 Initial startup 14 16 Checks during and after initial start up 15 17 Temporary shutdown 16 18 Preparing for extended ...

Страница 4: ...d with water in a percentage vary ing from 30 to 50 as instructed in the installation and maintenance manual for the B solar collec tors b b Only fill the solar collector primary circuit with water and glycol premixed in the percentages specified in the B installation and maintenance manual b b This instruction manual is an integral part of the prod uct It must be kept safe and must ALWAYS accom p...

Страница 5: ...a Max pot assorb sup Puiss absor serp sup Power abs by top coil Beretta Caldaie Via Risorgimento 13 23900 Lecco LC BALLON SOLAIRE Modele Model Fabrication Code Année bar W l W kW l 1 BOLLITORE SOLARE Modello Matricola Codice Anno m2 m2 T067764IFE SOLARBOILER Serial number Code Year Dispersioni secondo EN 12897 Déperditions selon EN 12897 Heat loss according to EN 12897 V Hz Alimentazione elettrica...

Страница 6: ...n 10 Valve group 11 Cover 12 Plug for anode inspection and lifting 13 Outlet temperature gauge 14 Outlet valve M 15 Solar controller 16 Outlet pipe to coil 17 Return pipe from coil 18 Sensor power cable entrance 19 Flow meter l min 20 Flow regulator 21 Cock B 22 Pump 23 Pressure gauge 24 Cock A 25 Fitting for expansion vessel 26 Safety valve outlet 27 Safety valve 6 bar 28 Return valve R 29 Fittin...

Страница 7: ...2 F Ø Coil water capacity 4 8 l Coil heat exchange surface area 0 78 m2 NL performance factor 1 7 Maximum working pressure of coils 10 bar Maximum working pressure of storage cylinder 10 bar Maximum operating temperature 99 C Net weight with insulation 72 kg Heat loss according to EN 12897 2006 at ΔT 45 C 96 W Energy efficiency class D DHW production T 35 C Primary coil at 80 C 585 l h Primary coi...

Страница 8: ...0 200 400 600 800 1000 FLOW RATE l h Tests performed with a 30 glycol water solution Residual head Water outlet and return group RESIDUAL HEAD mbar 800 700 600 500 400 300 0 200 400 600 800 FLOW RATE l h Tests performed with water at 20 C Flow regulator fully open ...

Страница 9: ...ithout a boiler heating pump A suitably rated pump must be provided and installed separately Flow rate from the solar collector circuit depends on the type and number of collectors installed For further information consult the manual for the collectors b b The domestic hot water system MUST INCLUDE an expansion vessel safety valve automatic vent valve and stor age cylinder drain cock b b Safety va...

Страница 10: ... to the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B Temperature sensor C Guide Psr Solar controller temperature sensor socket b b Joins between temperature sensor cables and control panel extension cables must be soldered and protected by sheaths o...

Страница 11: ... cylinder drain 1 F Ø Psr Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 mm TR Temperature gauge DSA Sensor power cable entrance ICP Rear cable entrance A 800 mm B 590 mm C 335 mm D 605 mm E 825 Ø mm F 170 mm G 360 mm H 250 mm I 895 mm L 1055 mm b b We recommend that you install iso...

Страница 12: ...age cyl inder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is able to support the weight of the storage cylinder Remove the brackets 1 then carefully rotate and slide the storage cylinder off the pallet on to the plat form Make sure that the storage cylinder is perfectly sta ble and then...

Страница 13: ...move all sludge and lime scale and has been vented and seal tested Make sure that a suitable water treatment system is installed if the quality of the supply recirculation water so demands refer to the reference values listed in the table alongside REFERENCE VALUES pH 6 8 Electrical conductivity less than 200 μS cm 25 C Chlorine ions less than 50 ppm Sulphuric acid ions less than 50 ppm Total iron...

Страница 14: ...with water in a suitable container before being used to fill the system For example a mix of 40 glycol and 60 water provides anti freeze protection down to a tem perature of 21 C Anti freeze Temperature Density 50 32 C 1 045 kg dm3 40 21 C 1 037 kg dm3 30 13 C 1 029 kg dm3 b b The propylene glycol supplied is specially formulat ed for solar collector applications and remains fully efficient throug...

Страница 15: ...ow rate in the solar collector circuit is equivalent to 30 l h for each m2 of collector area Check that the solar collector circuit has been prop erly bled Check that the pressure of the system when cold is approximately 3 bar Check that the safety valve operates at 6 bar All the pipes in the water circuit have been insulated in conformity to relevant standards 1 2 3 4 5 0 6 Provided all the above...

Страница 16: ...problems in completing the above proce dure 19 MAINTENANCE Scheduled maintenance is essential for the safety efficien cy and long working life of your storage cylinder Proper maintenance also reduces energy consumption and en sures reliability over time Have your storage cylinder ser viced either by the manufacturer s Technical Assistance Centre or by a qualified heating engineer at least once a y...

Страница 17: ...ear and replace it if necessary On completion of cleaning follow the above steps in the reverse order to refit all removed parts b b Tighten the bolts 7 proceeding diagonally around the flange to apply pressure uniformly around the seal Fill the storage cylinder s DHW secondary circuit and check that there are no leaks from any of the seals Check the performance of the storage cylinder 9 8 7 6 5 4...

Страница 18: ... on the environment and save energy before leaving for the weekend or a short break etc pro vided outdoor temperatures will remain above ZERO sim ply adjust the storage cylinder s thermostat to its minimum temperature b b If outdoor temperature may drop below ZERO risk of freezing perform the operations described in the Preparing for extended periods of disuse section 25 PREPARING FOR EXTENDED PER...

Страница 19: ...19 END USER ...

Страница 20: ...boilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improvement This publication cannot therefore be understood as a contract with third parties ...

Отзывы: