H

Pressure at boiler

up to 15 m

3 bar

15 - 20 m

3,5 bar

20 - 25 m

4 bar

25 - 30 m

4,5 bar

General rule: p [bar] = 1.5 + H [m] / 10

Checks

On completion of the installation, perform the checks listed in the table below.

CHECKS

Collector circuit

Cold circuit pressure:____bar (see table 

above)

Collector circuit seal test

Safety valve check

Anti-freeze checked to - ___ °C

pH of heat transfer fluid = ____

Collector circuit bled

Flow rate of 30 l/h per m

2

 checked

Non-return valve functioning

Solar collectors

Visual check of collectors

Collectors cleaned if necessary

Visual check of collector fixing points

Visual check of roof impermeability

Visual check of insulation/lagging

Maintenance

Service the system and perform the checks listed in the tables below at least once every two years.

MAINTENANCE

Collector circuit

Cold circuit pressure:____bar (see table 

above)

Collector circuit seal test

Safety valve check

Anti-freeze checked to - ___ °C

pH of heat transfer fluid = ____

Collector circuit bled

Flow rate of 30 l/h per m

2

 checked

Non-return valve functioning

Solar collectors

Visual check of collectors

Collectors cleaned if necessary

Visual check of collector fixing points

Visual check of roof impermeability

Visual check of insulation/lagging

Checking the heat transfer liquid

Check the anti-freeze effect and the pH level of the heat transfer liquid every 2 years.

 - Use an instrument like a refractometer or densimeter to check the anti-freeze effect (which must have a nominal pro-

tection value of approx. -30°C). If the protection threshold is higher than -26°C, replace the mix, or add anti-freeze 

as required.

 - Use litmus paper to check the pH (nominal value approx. 7.5). If the measured value is below 7, change the heat 

transfer liquid.

Содержание 20095379

Страница 1: ...SCF 20B Solar Solar Collector EN Installation manual Installation manual...

Страница 2: ...mals caused by improper installation adjustment maintenance or use Range MODEL CODE SCF 20B 20095379 SCF 20B Pack of 2 20095380 SCF 20B Pack of 7 20095381 RANGE Contents CONTENTS The following symbols...

Страница 3: ...011 7S2400F 13000000 BAR CODE 128B Anno di produzione SERIALE PROGRESSIVO Code Year of production Serial Number Description Flat plate solar collector Dimensions Gross area Aperture area Absorber area...

Страница 4: ...scription U M IAM 50 0 87 Efficiency col 58 Tested according to EN 12975 referred to a 33 3 water glycol mix flow rate of 140 l h and irradiation G 800W m2 Tm Coll _inlet _temp Coll _outlet_temp 2 T m...

Страница 5: ...e heat exchanger must be the one near the sensor pocket of the last collector of the line The connection with the circuit that comes back from the heat exchanger must be at the bottom of the first col...

Страница 6: ...4 4 8 11 10 12 7 5 20 M 9 C 6 T M 2 Solar Regolator 17 15 16 18 3 R 1 1 19 19 Water control system 13 14 b b If copper pipes are used joints must be hot brazed b b We recommend the use of stainless st...

Страница 7: ...em into service im mediately A B 1 1 Handling HANDLING Remove the PVC wrapping to free the solar collector from the pallet Apply the data label provided in the document enve lope to the back of the so...

Страница 8: ...cted against damage by the weather and birds and animals Angle of collectors General Solar collectors are designed to be installed at angles of between 15 minimum and 75 maximum Make sure that the ble...

Страница 9: ...lar circuit at ambient temper ature with the collectors shielded from the sun s rays 1 Open the non return valve A 2 Open the air vent at the highest point in the system see figure alongside and keep...

Страница 10: ...ery two years MAINTENANCE Collector circuit Cold circuit pressure ____bar see table above Collector circuit seal test Safety valve check Anti freeze checked to ___ C pH of heat transfer fluid ____ Col...

Страница 11: ...11...

Страница 12: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Отзывы: