20
Installation
6005736_0 – 25.03.2021
3.5.12 Inserting lower section and separating unit
☞
Insert the separating unit into the mounting slot with
both hands.
☞
Press the separating unit up until it latches into place.
☞
Guide the lower section into the device from below, until
the guide pins of the lower section are in front of the
guide grooves on both sides.
☞
Press the guide pins of the lower sections into the guide
grooves.
☞
Pull the lower section downwards until it latches into
place.
☞
Check that the lower section can be moved easily.
☞
Pivot the lower section upwards until both magnetic
fasteners can be heard to click into place.
3.5.13 Check and carry out commissioning
D
ATTENTION!
Risk of disruptions due to moisture in the device!
If the device is moved from a cold environment into a hot
one, condensation may form inside.
☞
Wait about 2-3 hours before bringing the device into
service.
☞
Remove the protective film from the device.
☞
Check that the mains plug is freely accessible or that
an all-pole isolating device (min. 3 mm contact gap) is
present.
☞
Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞
Ensure that air outlets are not closed or covered.
☞
With recirculated air devices: Make sure that the
ventilation slots are free.
☞
Make sure that the protective film is removed.
After establishing the power supply the device is ready for
operation.
☞
Check the correct functioning of the device.
D
Содержание Smartline BIH 100 ST
Страница 34: ...34 6005736_0 25 03 2021 ...
Страница 35: ...35 6005736_0 25 03 2021 ...
Страница 36: ...6005736_0 25 03 2021 ...