Preparing for installation
24
The following illustration shows how the sound is
switched off.
¾
Carefully fold the cover up approx. 45°.
¾
Secure the connector on the control electronics.
¾
Secure the connector on the LED strip.
ATTENTION
Risk of damaging the electronics due
to unintentional damage.
¾
Do not trap any cables.
¾
Do not touch the electronics.
¾
Close the lower cover flap completely.
¾
Install the screws.
Removing the fluff screen
The fluff screen must be removed before installing
the extractor hood. The fluff screen is held by a
magnet.
¾
Make sure that the rotary knob is removed.
¾
Lay the device, with the front panels facing up, on
a flat, protective surface.
¾
Pull on the rounded upper edge of the lower front
flap until the front flap is completely open.
¾
Grip the fluff screen by the knob in the centre of
the screen.
¾
Pull the fluff screen off forwards.
Removing the upper grease tray
The upper grease tray must be removed prior to
installation so that the lower fastening points are
subsequently accessible. The upper grease tray is