Inspection Upon Receipt
2.1
Inspection Upon Receipt
When you first receive the EKP (enhanced keypad), perform the following
checks:
•
Verify that you have received the proper keypad by checking the carton
label and other shipping documentation.
•
Carefully inspect the package for any damage sustained in transit. If damage
is apparent, the shipping agent should be notified.
Components Of Installation Kit
2.2
Components of Installation Kit
After checking that the correct keypad arrived in good condition, verify that all
components for installing the keypad are included. The following components
should be in the kit:
•
1 Remote Keypad Unit (RSiEKPG-01).
•
1 six-foot interconnection cable (RSiEKPCABLER6).
•
1 hardware package (two threaded studs, two oversized washers, and two
locking nuts).
If there are missing parts, please notify your nearest Benshaw representative.
16
2 - INSTALLATION
Содержание ENHANCED KEYPAD
Страница 3: ...1 Introduction 1...
Страница 16: ...Notes 14 1 INTRODUCTION...
Страница 17: ...2 Installation 15...
Страница 22: ...Notes 20 2 INSTALLATION...
Страница 23: ...Revision History Revision Date ECO 00 19 11 02 890020 05 00 Initial Release 01 29 03 05 ECO 0982...