105
189143 RCD-2
Index A
14.5 LAUNCH/LIFT OUT
The initial commissioning of your boat will require a lot of skill and care. The proper working of all your boat's equipment
is the result of the quality of the commissioning operations. This is why the initial launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Prepare enough fenders and lines.
14.6 STEPPING/UNSTEPPING THE MAST
The stepping /unstepping operations require the skills of a professional rigger: please consult your dealer.
Mast adjustment
NOTE:
The recommended values should be respected (at minimum), since with these tensions the rigging is tight and the
minimum cable flexibility (extension) when sailing to prevent mast movement.
The load on the wires can only be measured by using a tensiometer.
Necessary material:
- Tensiometer gauge from Loos & CO, model PT2M.
Do not remain onboard or beneath the boat
during the handling operations.
- When placing the slings make sure that the
positioning marks are still visible.
- Submerge the sling fully under the engine
mounting.
Ha
ndlin
g, t
ran
spor
t
14
14
Содержание First 20
Страница 1: ...189143 RCD 2 Index A OWNER S MANUAL ...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 13: ...13 DESIGN CATEGORIES AND DISPLACEMENT Design categories 16 2 ...
Страница 17: ...17 STABILITY AND BUOYANCY Stability data 18 Access to the boat 19 3 ...
Страница 20: ......
Страница 21: ...21 MANOEUVRABILITY Visibility from the steering station 23 4 ...
Страница 24: ......
Страница 34: ...34 189143 RCD 2 Index A 8 Stepping the mast Raise the mast by pulling on the downhaul Rigging and sails ...
Страница 58: ......
Страница 64: ......
Страница 72: ......
Страница 80: ......
Страница 86: ......
Страница 87: ...87 STEERING SYSTEM General points 88 Centreboard 88 Layout diagram 90 11 11 ...
Страница 89: ...89 189143 RCD 2 Index A Layout of components Centreboard Mechanism Steering system 11 11 ...
Страница 91: ...91 DECK FITTINGS General points 92 Berthing anchoring towing 95 Main elements of the chain locker 96 12 12 ...
Страница 97: ...97 HULL FITTINGS Upholstery 98 Interior woodwork 100 Interior maintenance 100 Saloon table 100 13 13 ...
Страница 109: ...109 ENVIRONMENT Waste management 110 15 15 ...
Страница 111: ...111 APPENDIXE Meaning of the labels 112 ...
Страница 114: ......