176
197855 RCD-2
Index B
17.4 LAUNCH/LIFT OUT
The initial commissioning of your boat will require a lot of skill and care. The proper working of all your boat's equipment
is the result of the quality of the commissioning operations. This is why the initial launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Check the anodes (see Chapter: E
- Check the propeller/hydrolube bush (see Chapter: S
- Prepare enough fenders and lines.
- Check the engine's sea water intake valve and the fuel feed valve (see Chapter: E
Do not remain onboard or beneath the boat
during the handling operations.
- When placing the slings make sure that the
positioning marks are still visible.
- Submerge the sling fully under the engine
mounting.
Handling, transport
Содержание ANTARES 36
Страница 1: ...197855 RCD 2 Index B ANTARES 36 OWNER S MANUAL ...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 13: ...13 DESIGN CATEGORIES AND DISPLACEMENT Design categories 16 2 ...
Страница 17: ...17 STABILITY AND BUOYANCY Stability data 18 Access to the boat 19 3 ...
Страница 20: ...20 197855 RCD 2 Index B Access to the engine compartment Saloon Aft cabin Stability and buoyancy ...
Страница 21: ...197855 RCD 2 Index B 21 Access to the flybridge Direct access to cockpit locker Stability and buoyancy 3 ...
Страница 22: ...22 197855 RCD 2 Index B Access to the saloon Stability and buoyancy ...
Страница 23: ...23 MANOEUVRABILITY Visibility from the steering station 25 4 ...
Страница 50: ......
Страница 61: ...197855 RCD 2 Index B 61 7 2 7 Layout of the deck wiring looms DC circuit 3 L L F F Electrical system 7 ...
Страница 82: ......
Страница 83: ...83 DOMESTIC APPLIANCES Fridge Cooler 84 Hot plate 86 9 ...
Страница 87: ...87 AUDIO VISUAL EQUIPMENT Television 88 Hifi 89 10 10 ...
Страница 90: ......
Страница 108: ......
Страница 113: ...197855 RCD 2 Index B 113 Water tank Location Aft cabin Gauge Location Passageway Water systems 12 12 ...
Страница 128: ......
Страница 137: ...197855 RCD 2 Index B 137 13 7 ENGINE INSTALLATION 26 12 01 02 03 07 21 22 23 24 27 29 Engine 13 13 ...
Страница 138: ...138 197855 RCD 2 Index B 19 28 14 17 18 20 09 09 13 15 16 16 06 Engine ...
Страница 142: ...142 197855 RCD 2 Index B DIAGRAM OF THE LAYOUT Engine ...
Страница 146: ......
Страница 147: ...147 STEERING SYSTEM General points 148 Layout diagram 149 Hydraulic steering 151 Bow thruster 152 14 14 ...
Страница 149: ...197855 RCD 2 Index B 149 14 2 LAYOUT DIAGRAM Steering system 14 14 ...
Страница 154: ......
Страница 166: ......
Страница 167: ...167 HULL FITTINGS Upholstery 168 Interior woodwork 171 Interior maintenance 171 16 16 ...
Страница 172: ......
Страница 179: ...179 ENVIRONMENT Waste management 180 ...
Страница 181: ...181 APPENDIXE Meaning of the labels 182 ...
Страница 184: ......