
7
STEP 1
(Selecting Site)
Before installing your new lift, check the following.
1. LIFT LOCATION: Always use architectural plans
when available. Check the layout dimension against the
fl oor plan requirements making sure that adequate space
if available.
2. OVERHEAD OBSTRUCTIONS: The area where the
lift will be located should be free of overhead obstructions
such as heaters, building supports, electrical lines etc.
3. DEFECTIVE FLOOR: Visually inspect the site where
the lift is to be installed and check for cracked or defective
concrete.
4. Your new BendPak Two-Post lift is designed for
INDOOR INSTALLATION ONLY.
STEP 2
(Floor Requirements)
This lift must be installed on a solid level concrete fl oor
with no more than 3-degrees of slope. Failure to do so
could cause personal injury or death.
A level fl oor is suggested for proper use and installation
and level lifting. If a fl oor is of questionable slope, consider
a survey of the site and/or the possibility of pouring a new
level concrete slab.
DO NOT install or use this lift on any asphalt surface
or any surface other than concrete.
DO NOT install or use this lift on expansion seams
or on cracked or defective concrete.
DO NOT install or use this lift on a second / elevated
fl oor without fi rst consulting building architect.
DO NOT install or use this lift outdoors.
CONCRETE SPECIFICATIONS
LIFT MODEL CONCRETE REQUIREMENTS
XPR-9D
4” Min. Thickness / 3,000 PSI
DANGER!
ALL MODELS MUST BE INSTALLED ON 3000 PSI
CONCRETE ONLY CONFORMING TO THE MINIMUM
REQUIREMENTS SHOWN ABOVE. NEW CONCRETE
MUST BE ADEQUATELY CURED FOR A MINIMUM OF
28 DAYS.
IMPORTANT NOTICE
THESE INSTRUCTIONS MUST BE FOLLOWED TO INSURE PROPER INSTALLATION AND OPERATION OF YOUR
LIFT. FAILURE TO COMPLY WITH THESE INSTRUCTIONS CAN RESULT IN SERIOUS BODILY HARM AND VOID
PRODUCT WARRANTY. MANUFACTURER WILL ASSUME NO LIABILITY FOR LOSS OR DAMAGE OF ANY KIND,
EXPRESSED OR IMPLIED, RESULTING FROM IMPROPER INSTALLATION OR USE OF THIS PRODUCT.
PLEASE READ ENTIRE MANUAL PRIOR TO INSTALLATION
Rotary Hammer Drill or Similar
3/4” Masonry Bit
Hammer
4 Foot Level
Open-End Wrench Set: SAE/Metric
Socket And Ratchet Set: SAE/Metric
Hex-Key / Allen Wrench Set
Large Crescent Wrench
Large Pipe Wrench
Crow Bar
Chalk Line
Medium Flat Screwdriver
Tape Measure: 25 Foot Minimum
Needle Nose Pliers
TOOLS REQUIRED
IMPORTANT NOTE
BendPak lifts are supplied with installation instructions and concrete fasteners meeting the criteria as prescribed by the
American National Standard "Automotive Lifts - Safety Requirements for Construction, Testing, and Validation" ANSI/ALI
ALCTV-2006. Lift buyers are responsible for any special regional structural and/or seismic anchoring requirements specifi ed
by any other agencies and/or codes such as the Uniform Building Code (UBC) and/or International Building Code (IBC).