background image

6

RE-6

 & RE-6NC

 VALVES EMERGENCY 

APPLICATION

(Trailer air system charged to normal operating pressure).  
Venting the emergency supply line to atmosphere will 
cause the emergency portion of the relay emergency 
valve to apply full trailer reservoir pressure to the trailer 
service chambers.  If the emergency supply line pressure 
is reduced to approximately 20 psi, a graduated trailer 
air chamber application will occur.  The rate of this brake 
application will depend upon the rate of pressure loss in 
the emergency supply line.  

In an emergency, air would be removed from the emergency 
supply line port of the RE-6

 and RE-6NC

 valves, allowing 

the emergency piston to return to its released position.  

TO RELEASE AN EMERGENCY APPLICATION

RE-6

 & RE-6NC

 VALVES

Charge the trailer air system or:

A.  For trailers equipped with standard brake chambers, 

block wheels and drain trailer reservoir.

B.  For trailers equipped with spring brake chambers, 

block wheels and mechanically release spring brake 
chambers via the mechanical release mechanism (for 
specifi c instructions, refer to manufacturers service 
literature.)

WARNING! PLEASE READ AND FOLLOW 
THESE INSTRUCTIONS TO AVOID PERSONAL 
INJURY OR DEATH:

When working on or around a vehicle, the following 
general precautions should be observed at all times.

1.  Park the vehicle on a level surface, apply the 

parking brakes, and always block the wheels.  
Always wear safety glasses.  

2.  Stop the engine and remove ignition key when 

working under or around the vehicle.  When 
working in the engine compartment, the engine 
should be shut off and the ignition key should be 
removed. Where circumstances require that the 
engine be in operation, EXTREME CAUTION should 
be used to prevent personal injury resulting from 
contact with moving, rotating, leaking, heated or 
electrically charged components.

3.  Do not attempt to install, remove, disassemble 

or assemble a component until you have read 
and thoroughly understand the recommended 
procedures.  Use only the proper tools and observe 
all precautions pertaining to use of those tools.

4.  If the work is being performed on the vehicle’s 

air brake system, or any auxiliary pressurized air 
systems, make certain to drain the air pressure 
from all reservoirs before beginning ANY work 
on the vehicle.  If the vehicle is equipped with an 
AD-IS

®

 air dryer system or a dryer reservoir module, 

be sure to drain the purge reservoir.

5.  Following the vehicle manufacturer’s recommended 

procedures, deactivate the electrical system in a 
manner that safely removes all electrical power 
from the vehicle.

6.  Never exceed manufacturer’s recommended 

pressures.  

7.  Never connect or disconnect a hose or line 

containing pressure; it may whip. Never remove 
a component or plug unless you are certain all 
system pressure has been depleted.

FULL SYSTEM 

PRESSURE

EMERGENCY 

SUPPLY LINE

FALLING 

FROM FULL 

SYSTEM 

PRESSURE

FIGURE 11 

RE-6

 & RE-6NC

 RELAY VALVE EMERGENCY 

APPLICATION

When the emergency piston moves back to its released 
position, the seal is open between the emergency piston 
and the inlet / exhaust valve.  The open valve allows air to 
fl ow from the reservoir, past the shoulder in the emergency 
piston, past the inlet / exhaust valve, past the underside 
of the relay piston moving on to the service chambers 
creating an emergency application.  Full reservoir pressure 
will be applied to the service chambers and will not be 
removed until the pressure in the emergency port of the 
RE-6

 or RE-6NC

 valve reaches at least 60 psi.  When 

the emergency port pressure reaches any pressure above 
60 psi, the emergency piston and inlet / exhaust valve will 
move from the seat of the relay piston allowing the service 
chambers to exhaust the air.  Refer to Figure 11.

If the dolly is not equipped with parking actuators (such as 
spring brakes), the wheels should be blocked to prevent 
trailer movement. 

Содержание RE-6 RELAY EMERGENCY VALVE

Страница 1: ...6NC RELAY VALVE SPECIAL IDENTIFICATION TAG RE 6NC SPECIAL XXXXXX SVC REPL XXXXXX Bendix RE 6 and RE 6NC Relay Valves FIGURE 1 RE 6 RE 6NC RELAY VALVES CAP SCREW SEALING RING O RING RELAY PISTON SERVI...

Страница 2: ...voir Single Check Valve R 12P Valve SV 4 Valve Bulkhead Drain Valve PR 3 Valve Trailer Gladhand Single Check Valve RE 6 RELAY VALVE DOLLY SYSTEM CONFIGURATION Bulkhead SV 4 Valve RE 6 Valve Slack Adju...

Страница 3: ...e acts upon the emergency piston pushing the emergency piston toward the inlet exhaust valve seat System pressure in the chambers and reservoir are still at 0 psi in the RE 6NC valve system allowing f...

Страница 4: ...g drive away In the RE 6NC valve air is still acting upon the emergency piston but there is no pressure in the reservoir and the chambers The emergency piston and inlet exhaust valve have moved to the...

Страница 5: ...10 PSI SERVICE BRAKE APPLICATION 10 PSI FIGURE 9 RE 6 RE 6NC RELAY VALVES SERVICE HOLD CHAMBER HOLD 5 PSI SERVICE HOLD 5 PSI NO AIR FLOW brakes Air is applied to the control port of the RE 6 and RE 6...

Страница 6: ...nts 3 Do not attempt to install remove disassemble or assemble a component until you have read and thoroughly understand the recommended procedures Use only the proper tools and observe all precaution...

Страница 7: ...ust port Leakage of a 1 bubble in 5 seconds is permissible 4 Make and hold a full brake application and again apply a leak check solution to the RE 6 or RE 6NC valve s exhaust Leakage of a 1 bubble in...

Страница 8: ...nspect all air line fittings for corrosion Replace as necessary Remove all old thread sealant before reuse ASSEMBLY Before assembly lubricate all o rings seals and pistons as well as body and cover bo...

Страница 9: ...in the maintenance kit INLET EXHAUST VALVE ASSEMBLY O RING 7 SPRING 5 SEALING RING 6 A O RING 8 O RING 2 O RING 13 O RING 14 O RING 19 O RING 21 SPRING 18 SPRING 20 SPRING 12 CHECK VALVE 17 SEAT 4 RE...

Страница 10: ...ecks may be made With air pressure present at outlet side of check valve and the inlet side open to atmosphere coat the open end of the check valve with soap suds a 1 bubble in 5 seconds is permissibl...

Страница 11: ...11...

Страница 12: ...12 BW1570 2007 Bendix Commercial Vehicle Systems LLC All rights reserved 7 2007 Printed in U S A...

Отзывы: