Testing and measuring
39
Now, the leakage current test is carried out:
Checking the limits
UNIMET
®
300ST monitors whether the limits are kept to throughout the test sequence.
If a limit is violated when measuring the PE conductor resistance, the test engineer can decide
whether to abort the test or continue to its completion:
With all the other measurements during which the limit has not been kept to, the test is continued.
However, the test system does not permit any hazardous currents:
Faulty DUTs can exhibit dangerous leakage currents. During all leakage current
measurements, testing is aborted immediately if a measured value >20 mA is
reached. UNIMET
®
300ST then shows:
The function test is carried out
I-ELC CI Diff.
Value: 0.04 mA
Limit: 0.50 mA
- - - Measuring - - -
I-ELC CI Diff. Ph-r
Value: 0.04 mA
Limit: 0.50 mA
- - - Measuring - - -
** ATTENTION! **
Limit for R-PE
exeeded!
Abort: ESC Repeat:
** Danger! **
Leak.current > 20 mA
Test finished
Continue:
¿
Содержание UNIMET 300ST
Страница 50: ...Testing and measuring 50 TGH1365en 10 2012...
Страница 58: ...Data 58 TGH1365en 10 2012...
Страница 61: ......