Testing and measuring
67
Power consumption
UNIMET® 1100ST measures the power consumed by the DUT.
At a load current less than 0.005 A, UNIMET® 1100ST will prompt you to confirm that the
DUT is actually switched on.
cooling-down phase
If the “Start-up” function is set to “Manual start” in the master data screen, after the last test
step carried out with this phase relation, UNIMET® 1100ST will wait until the DUT has been
shut down.
Please note that only DUTs with a power consumption of up to 3700 VA may be supplied
with power via the UNIMET® 1100ST test socket. If DUTs with higher power consumption
levels are connected, the thermomagnetic circuit-breaker integrated into the UNIMET®
1100ST power switch will trip. Once the DUT has been removed, the test system can be
switched again on after a few seconds.
Aborts the test.
F1
Allows the DUT to be switched on. Load current testing is repeated.
ENTER key
Confirms the lower value as correct. Continues the test.
Aborts the test.
ENTER key
Continues the test e.g. with the phase reversed.
<<
<<
Содержание UNIMET 1000ST
Страница 50: ...Operation and setting 50 TGH1256en 10 2005...
Страница 80: ...PC compatible functions of the UNIMET 1100ST 80 TGH1256en 10 2005...
Страница 82: ...Maintenance and calibration 82 TGH1256en 10 2005...
Страница 90: ...Options and accessories 90 TGH1256en 10 2005...
Страница 96: ...Data 96 TGH1256en 10 2005...
Страница 99: ......