Operation and setting
34
5. The test step now appears in the list of test steps.
6. Repeat the procedure to add other test steps to the test sequence (e.g. touch current test direct
test phase reversed # 116).
How to sort the test step sequence
1. Once all test steps required have been added and all test steps not required have been deleted,
the UNIMET® 1100ST can work out a sensible sequence for the test steps. Press
to sort
the test steps.
2. Press F1 to confirm that you wish to sort the test steps.
UNIMET® 1100ST has now sorted the test steps into groups (all visual inspections, all test
steps during which the DUT is not switched on, all test steps during which the DUT is
operated in one phase, all test steps during which the DUT is operated in the other phase,
all function tests, etc.).
A
Z
Содержание UNIMET 1000ST
Страница 50: ...Operation and setting 50 TGH1256en 10 2005...
Страница 80: ...PC compatible functions of the UNIMET 1100ST 80 TGH1256en 10 2005...
Страница 82: ...Maintenance and calibration 82 TGH1256en 10 2005...
Страница 90: ...Options and accessories 90 TGH1256en 10 2005...
Страница 96: ...Data 96 TGH1256en 10 2005...
Страница 99: ......