22 CC613_D00381_04_M_XXEN/11.2020
Configuration and testing
• Ethernet
• USB
• WLAN
5.1.3 Factory settings
i
Resetting to factory settings deletes all settings except the serial number.
Click the "Operator Default & Restart" button on
the
Operator
tab to reset changed parameters
of the operator configuration to default.
Click the "Settings Default & Restart" button on
the
Settings
tab to reset changed parameters to
default.
Click the "Manufacturer Default & Restart" button on the
Manufacturer
tab to reset changed parameters of
the manufacturer configuration to default. Click the "Factory Reset & Restart" button to reset the charge con-
troller to factory settings.
5.1.4 Testing and system boot process
After completing the configuration, the charge controller must be tested for operability. This can be done us-
ing a vehicle simulator. The following is checked:
• Successful boot process (OCPP state - IDLE).
• If intended, establishment of backend connection (connection state - CONNECTED).
• Connection to meter possible (meter configuration (OCPP)).
• Plug locking and unlocking works.
Fault messages are shown in the "Error list" on the
State
tab.
The boot process starts once the charge controller is supplied with voltage (12 V). After about 30 s, the
"STATUS" LED on the charge controller front panel lights up. After a short time, the "STATUS" LED flashes
green in case of a successful boot process.
5.1.5 Connectivity to the backend
Connection of the charge controller to the backend
Go to the
Settings
tab (http://192.168.123.123/operator/settings). To access this tab, enter the following user
name and password:
• User name: operator
• Password: yellow_zone
The following options are available at "Connection Type":
• No backend
• GSM (4G modem)