42
Bend-Tech Dragon A400
Assembly Manual
Torch
08
8.3 Route the Torch Lead
When mounting the Torch Wand on
the Toolhead, it is up to the Customer
to determine best routing for the
Torch Lead. Refer to diagram for
recommended routing.
Bend-Tech recommends securing
the Torch Lead to the Head Support
Strut on the left side of the machine.
Ensure the Torch cable is clear of
other cables and moving parts.
The Torch lead transmits high
voltage current which can affect
the performance of other electrical
components. This can create
connectivity issues and possible
machine malfunction.
The Customer should ensure the Torch Lead is secured so it is clear of the cables at
the top of the Toolhead. It is recommended that the Torch lead be secured so it loops
up above the components at the top of the Toolhead.
The Torch Lead should be
secured clear of other cables
and moving parts.
Ensure the Torch Lead has plenty of
clearance above the components at
the top of the Toolhead.
Important
Running the Torch Mount utility is required before the Dragon Machine is ready
for operation. This utility is used to set the torch operating height. The Torch
Mount procedure is outlined in the Startup and Training Manual Part 3.
Important
For any questions or concerns regarding the assembly of the Dragon machine
or installation of any of the Dragon components, contact Bend-Tech support at
1-651-257-8715 or [email protected].
Содержание Dragon A400
Страница 1: ...Part 1 of 1 Assembly Manual Revision 08 English 2022 Bend Tech LLC Dragon A400...
Страница 43: ...Attention After completing the Dragon A400 assembly proceed to the Startup Manual...
Страница 44: ...Bend Tech LLC 729 Prospect Ave Osceola WI 54020 1 651 257 8715 sales bend tech com www bend tech com...