background image

PAGE 4 

OPERATIONS AND MAINTENANCE PROCEDURES 

CONVEYOR TOASTER MODELS 

JT2-B 

 

GENERAL MAINTENANCE

  

 

1.

 

REPLACING HEATER TUBES (Tip – replace only one tube at a time to prevent 
confusion when re-wiring) 

a.

 

DISCONNECT TOASTER FROM POWER SOURCE. 

b.

 

Remove both side panels. 

c.

 

Disconnect heater tube wires from the terminal blocks by depressing the black 
button with the + sign. 

d.

 

Drop the heater tube retainer by loosening the screw or nuts and sliding the 
retainer down so that the holes line up. 

e.

 

Gently

 pull the tube to be replaced out of the toaster. 

f.

 

Gently

 slide the replacement tube into the toaster. 

g.

 

Slide the retainer back up and tighten the screw or nuts. 

 

2.

 

REPLACING FAN MOTOR (Tip – make note of which side the label on the fan motor is 
prior to removal) 

a.

 

DISCONNECT TOASTER FROM POWER SOURCE. 

b.

 

Remove the bottom cover. 

c.

 

Unplug the fan motor power supply cord. 

d.

 

Remove the (4) screws (and grill) that hold the fan motor in place. 

e.

 

Put the replacement fan motor and grill in place. Using the same (4) screws secure 
in place in the same manner as removed. 

f.

 

Reconnect the fan motor power cord. 

g.

 

Replace panels and test under power. 

 

3.

 

REPLACING BELT DRIVE MOTOR (

NOTE

: 208 volt and 240 volt motors have three 

wires, ONLY USE TWO. For 208 volts, use the white and black wires. For 240 volts, use 
the black and blue wires. Use a high temperature electrical tape to cap the unused wire to 
prevent short circuit) 

 

a.

 

DISCONNECT TOASTER FROM POWER SOURCE. 

b.

 

Remove side and bottom panels. 

c.

 

Remove the drive sprocket and chain from the drive motor shaft. (Tip – Loosen 
the drive motor mounting screws and slide the motor to loosen the chain) 

d.

 

Trace and remove the two drive motor wires from the terminal block by 
depressing the black button with the + sign. (Tip – make note of the color of the 
wires and only use the same colors on the new motor) 

e.

 

Remove the drive motor mounting screws and slide the motor out of the toaster. 

f.

 

Put the new drive motor in place and loosely replace the mounting screws. 

g.

 

Replace the drive sprocket and chain. (Tip -  measure the distance from the inside 
of each sprocket to the inside toaster wall for perfect alignment) 

h.

 

Slide the drive motor so the chain has between 1/8” and 1/4” play, and then 
tighten the four mounting screws. 

i.

 

Replace panels and test under power. 

 

Содержание JT2-B

Страница 1: ...OURS DAY 7 DAYS WEEK TABLE OF CONTENTS UNCRATNG AND INSPECTION PAGE 1 ASSEMBLY AND INSTALLATION PAGE 1 ELECTRICAL INSTALLATION PAGE 1 POWER SAVER FEATURE PAGE 2 TOASTING PROCEDURE PAGE 2 CLEANING DAILY WEEKLY PAGE 3 HIGH TEMPERATURE LIMIT PAGE 3 GENERAL MAINTENANCE PAGE 4 TROUBLESHOOTING GUIDE PAGE 5 HEATER TUBE GUIDE PAGE 5 SPARE PARTS LISTINGS PAGE 6 WIRE DIAGRAMS PAGE 7 8 9 WARRANTY PAGE 10 Rev...

Страница 2: ...ombustible heat insulating material and pay attention to fire prevention regulations CAUTION To reduce the risk of fire the appliance is to be installed in non combustible surroundings only with no combustible material within 18 inches of the sides front or rear of the appliance or within 40 inches above the appliance Bread may burn Therefore toasters must not be used near or below curtains and ot...

Страница 3: ... a reduced conveyer speed This also results in 60 savings in power consumption TOASTING PROCEDURE A BAGEL TOASTING Turn the power switch to the on position Set the Conveyor Speed Control knob to 50 Allow 30 minutes to heat from cold Place a sample of the desired product on the Conveyor Belt to test the settings If toasting is too light turn the Speed Control counterclockwise to a slower speed If t...

Страница 4: ...area under the toaster with a slightly dampened cloth 2 Wipe the conveyor surface and exterior surfaces 3 Remove and wash the Crumb Tray and then replace the Crumb Tray Weekly 1 Clean the air intake area under the toaster with a slightly dampened cloth 2 Plug the toaster in and turn the bottom switch to the ON position 3 Turn the Conveyor Speed Control to fastest setting 100 a For lightly soiled c...

Страница 5: ...ner as removed f Reconnect the fan motor power cord g Replace panels and test under power 3 REPLACING BELT DRIVE MOTOR NOTE 208 volt and 240 volt motors have three wires ONLY USE TWO For 208 volts use the white and black wires For 240 volts use the black and blue wires Use a high temperature electrical tape to cap the unused wire to prevent short circuit a DISCONNECT TOASTER FROM POWER SOURCE b Re...

Страница 6: ...OT HEAT a Call the Belleco Inc service group at 1 877 854 8006 as one or more Heater Tubes may need replacing 4 TESTING FOR AND CLEARING MECHANICAL BINDING a Remove side and bottom panels b Remove the drive sprocket and chain from the drive motor shaft Tip Loosen the drive motor mounting screws and slide the motor to loosen the chain c Slowly rotate the conveyor belt by hand to see where the bindi...

Страница 7: ...302 Load Up Rack 1 400381 Drive Motor 208 240V 1 401201 Conveyor Belt 1 201703 Driven Sprocket 1 401300 Drive Shaft 1 401340 Drive Chain 19 1 401384 Driven Shaft 1 401341 Knob Speed Control 1 401187 Heat Limit Switch 1 401100 Fan Motor 208 240V 1 401211 Grill Air Intake 1 401220 Fan Motor Cord 1 401060 Speed Control 1 200901 Fan Switch 1 401107 Toast Chute 1 300203 Bushing Rear 2 201100 Bushing Fr...

Страница 8: ...808 671101 FM L1 BLACK L2 WHITE G 6 SC BM SC FM 7 7 8 8 1 2 3 4 3 2 1 4 SPEED CONTROL 10 10 9 9 5 5 6 RESET FAN SWITCH WM DRIVE MOTOR BOTTOM TUBES TOP TUBES T2 T1 B1 B2 B1 B2 T1 T2 MODEL JT2 B 208 240 VOLTS AC SINGLE PHASE JT2B DS4 MJC 09 05 07 BLACK WHITE FOR 208 VOLT BLUE FOR 240 VOLT FAN MOTOR ...

Страница 9: ...SE FM L1 BLACK L2 WHITE G 6 SC BM SC FM 7 7 8 8 1 2 3 4 3 2 1 4 SPEED CONTROL 9 9 10 10 5 5 6 RESET FAN SWITCH WM DRIVE MOTOR BOTTOM TUBES TOP TUBES T2 T1 B1 B2 B1 B2 T1 T2 BLACK WHITE FOR 208 VOLT BLUE FOR 240 VOLT FAN MOTOR POWER SAVER FOR SERIAL NUMBER 0808 671101 AND GREATER POWER SAVER CONTACTS FULL POWER 2 4 1 3 STAND BY 1 2 ONLY PAGE 8 OPERATIONS AND MAINTENANCE PROCEDURES CONVEYOR TOASTER ...

Страница 10: ...WN BY MICHAEL CLAVET DATE 01 14 10 JT2B 3 2 kW QUARTZ TUBES 208 240 VOLT WIRE DIAGRAM SINGLE PHASE G 9 8 1 2 3 4 SPEED CONTROL 7 6 RESET FAN SWITCH DRIVE MOTOR BOTTOM TUBES TOP TUBES WHITE FOR 208 VOLT BLUE FOR 240 VOLT FAN MOTOR POWER SAVER Entry End T1 T2 T3 T4 B1 B2 208 VOLT TOP HEATER TUBE 204220 208 VOLT BOTTOM HEATER TUBE 204011 240 VOLT TOP HEATER TUBE 204221 240 VOLT BOTTOM HEATER TUBE 204...

Страница 11: ... be defective in either material or workmanship provided however that the repairs or replacement have been duly authorized by BELLECO Inc before the work is performed This warranty includes travel time not to exceed one 1 hour and mileage not to exceed fifty 50 miles 80 km Excluded from the travel and mileage coverage is the JE and JT1 series 3 This warranty does not apply to repairs or replacemen...

Отзывы: