MAP/5 Hardware Replacement
C-36
Issue 4.0 October 1996
8. Verify that terminator resistors are removed from their sockets on the
540-Mbyte disk. Verify that JP6 is removed on the 1-Gbyte disk.
!
CAUTION:
The hard disk may have a piece of grey plastic tape covering
unused connectors. DO NOT REMOVE THIS TAPE. Exposing these
connections could result in a short circuit when the hard disk is
installed.
9. Place the new hard disk drive in the drive tray, component side down.
10. Secure the hard disk drive to the drive tray with the same two screws you
set aside previously.
11. Determine your next step:
a. If you are installing a 540-Mbyte or the 2-Gbyte drive, continue with
Step 12.
b. If you are installing a 1-Gbyte drive, continue with “Connecting the
1-Gbyte Drive,” below.
12. Slide the drive tray in through the front of the drive housing.
13. Secure the drive tray to the drive housing with the same two screws you
set aside previously.
14. Reconnect the large white power connector to the hard disk drive.
Rounded corners should be up and the red wire should be on the left (as
you face the back of the drive).
15. Reconnect the control or SCSI cable to the hard disk drive.
The colored tracer wire should be on the right (as you face the back of the
drive).
The ribbon cable exits on both sides of the connector.
16. Replace the peripheral bay, auxiliary housing, and second hard drive
mounting bracket as described earlier in this appendix.
17. Replace the front panel and top cover and connect cables and power if
you have completed work inside the MAP/5.
You have completed this procedure.
Connecting the 1-Gbyte Drive
1. Connect the SCSI ribbon to the 50-pin flat ribbon SCSI cable connector on
the MAP/5 adapter card. This connector is located on the same side of the
card as the jumpers. Figure C-25 shows the face of the adapter card.
Figure C-26 shows the SCSI cable connector assignments.
The colored tracer wire should be on the right as you face the back of the
drive and the ribbon cable should exit the connector in both directions.
Содержание Lucent Technologies INTUITY MAP/5
Страница 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Страница 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Страница 12: ...Contents xii Issue 4 0 October 1996 ...
Страница 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Страница 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Страница 89: ...Removing the Front Panel Issue 4 0 October 1996 5 5 Figure 5 1 Removing the MAP 5 Front Panel Tab slots Tabs ...
Страница 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Страница 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Страница 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Страница 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Страница 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Страница 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Страница 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Страница 266: ...Index IN 6 Issue 4 0 October 1996 ...