
MAP/5 Hardware Replacement
C-16
Issue 4.0 October 1996
Figure C-7.
Screw and Latch Locations on the System Board
6. Release the four latches, beginning with two on one side and then the two
on the other side. Lift the system board out when it is free.
7. Remove the 16 MB SIMM. This procedure is given earlier in this appendix.
You have completed this procedure.
Latches
Latches
Screws
Содержание Lucent Technologies INTUITY MAP/5
Страница 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Страница 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Страница 12: ...Contents xii Issue 4 0 October 1996 ...
Страница 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Страница 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Страница 89: ...Removing the Front Panel Issue 4 0 October 1996 5 5 Figure 5 1 Removing the MAP 5 Front Panel Tab slots Tabs ...
Страница 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Страница 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Страница 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Страница 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Страница 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Страница 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Страница 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Страница 266: ...Index IN 6 Issue 4 0 October 1996 ...