
Completing all Other Cabling
Issue 4.0 October 1996
3-11
For more information on configuring the modems for remote maintenance or
remote administration, see
Intuity Software Installation for Release 3.0
,
585-310-160.
The networking modems are connected through the breakout box. For more
information on networking, see
Intuity AUDIX Release Digital Networking
Administration,
585-310-533.
Completing all Other Cabling
Prior to turning on the MAP/5, all other cable connections should be completed
as well. These include:
■
Connecting the Tip/Ring IVC6 circuit card to phone lines (channel
capacity and allocation)
■
Connecting the GP Synch card or DCIU to most Lucent Technologies
switches
■
Connecting the ACCX card to the network
■
Making asynchronous connections with the multi-port circuit card
Use pinout and channel information found in Chapter 1, ‘‘Preparing the Site’’
Make cable connections using information in Appendix B, ‘‘Cable Connectivity’’.
Connecting the System to the Power
Supply
A dedicated line should be provided for the MAP/5. Use the following procedure
to ensure that the system is connected properly to the power outlet and is
receiving power:
1. Plug one end of the MAP/5 power cord into the AC input on the rear of the
unit. Refer to Figure 3-1 for the location of the AC input.
NOTE:
The power cord needed for your country/continent is described in
Chapter 1 of this book in the section titled, ‘‘Power Requirements’’ on
page 1-5. Refer to Table 1-3.
2. Plug the other end of the MAP/5 power cord into the designated 115 VAC
power outlet or the 200–250 VAC power outlet, depending on your
configuration.
3. Verify the voltage selector switch is set to the correct input power setting
(110 or 220 VAC). Refer to Figure 3-1 for the location of the voltage
selector switch on the rear of the unit.
4. Place the monitor's power switch in the ON position.
Содержание Lucent Technologies INTUITY MAP/5
Страница 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Страница 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Страница 12: ...Contents xii Issue 4 0 October 1996 ...
Страница 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Страница 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Страница 89: ...Removing the Front Panel Issue 4 0 October 1996 5 5 Figure 5 1 Removing the MAP 5 Front Panel Tab slots Tabs ...
Страница 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Страница 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Страница 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Страница 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Страница 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Страница 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Страница 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Страница 266: ...Index IN 6 Issue 4 0 October 1996 ...