
Installing a General Purpose Synchronous Controller
AT/E
Issue 4.0 October 1996
8-7
Figure 8-5.
I/O Base Address Jumper Settings
Port A jumpers on the GP Synch card require a different type of strap in order to
set the jumpers. See Figure 8-6 to set these jumpers.
Figure 8-6.
How to Set the Port A Jumpers on the GP Synch
Card
4
5
6
7
8
9
0
1
2
3
4
5
Do not use these jumpers
I/O Base Address
Dx240 - Dx24F
(factory default)
J1
J2
J3
J4
J5
Содержание Lucent Technologies INTUITY MAP/5
Страница 1: ...INTUITY MAP 5 Hardware Installation 585 310 146 Comcode107856882 Issue 4 October 1996 ...
Страница 11: ...Contents Issue 4 0 October 1996 xi ABB Abbreviations ABB 1 GL Glossary GL 1 IN Index IN 1 ...
Страница 12: ...Contents xii Issue 4 0 October 1996 ...
Страница 50: ...Getting Started 2 4 Issue 4 0 October 1996 Figure 2 1 How to Hold a Short Circuit Card ...
Страница 76: ...Connecting Peripherals and Powering Up 3 20 Issue 4 0 October 1996 ...
Страница 89: ...Removing the Front Panel Issue 4 0 October 1996 5 5 Figure 5 1 Removing the MAP 5 Front Panel Tab slots Tabs ...
Страница 94: ...Getting Inside the Computer 5 10 Issue 4 0 October 1996 ...
Страница 100: ...Installing Circuit Cards Introduction and Types 6 6 Issue 4 0 October 1996 ...
Страница 104: ...Installing Tip Ring Circuit Cards 7 4 Issue 4 0 October 1996 ...
Страница 138: ...Installing Optional Hardware 10 18 Issue 4 0 October 1996 ...
Страница 146: ...Finishing Up 11 8 Issue 4 0 October 1996 ...
Страница 150: ...Component Ordering Numbers A 4 Issue 4 0 October 1996 ...
Страница 184: ...Cable Connectivity B 34 Issue 4 0 October 1996 ...
Страница 266: ...Index IN 6 Issue 4 0 October 1996 ...