11
Step 6. Install cage roller on both roller arms. Ensure grease fitting is to the outside. Secure in place with
nuts and cotter pins.
Step 7. Attach the packer wheel arm. Step 8. Attach and install the roller Adjustment rod .
Step 9. Install Roller Support Plates WITH
FRONT BOLTS ONLY. THE BACK BOLTS
ARE INSTALL AFTER THE CHAIN GUARDS Step 10. Install Chains
ARE INSTALLED.
Содержание Tar River DRL-048
Страница 1: ...1 DRL 048 DRL 072 CROP SEEDER Operator s Manual Rev 8 2019 ...
Страница 18: ...18 Crop Seeder DRL 048 DRL 072 ...
Страница 20: ...20 Crop Seeder DRL 048 DRL 072 ...