General
Typically, the electrical portion of the installation is the most substantial. Begin by referencing the
supplied electrical drawings and review
ing our “Best Practice Methods” within this chapter.
Understanding the electrical requirements for the FreeStyler® system, in addition to these Best
Practice Methods will not only assist with a successful installation but will also ensure proper future
system performance.
A FreeStyler® system will typically require between 30 and 40 man/hours to complete the electrical
installation. This assumes that the main supply lines to the building are in place.
Note:
If there is just one electrician performing the installation and depending on the number of
hours they work per day, expect that it will take between three to five days to complete the
work. Please keep this in mind as you coordinate your project resource schedule.
Electrical Standards Overview
This section will cover the required main electrical feeds needed for a standard installation.
Utility Requirements
The following specifications are meant as a quick reference and guideline only. Your site may vary
depending on your setup, configuration and/or local code. Contact your local Belanger®
Representative for questions.
The chart on the next page shows the voltages recommended by Belanger®. For
any higher voltages, please contact your local Belanger® Representative.
❖
Actual electrical requirements are dependent on state and local codes.
❖
Values listed below are only valid for 208V systems. Contact the factory if you are operating
with a voltage other than 208/230V.
The FreeStyler® carwash should have a 2” water meter at 60PSI or 1-1/2” meter at 60PSI to
supply the entire system.
Note:
If your FreeStyler® is supplied with less than 60PSI, a Booster Pump is
recommended. The Booster pump specifications are on the following page.
Содержание FreeStyler
Страница 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Страница 14: ......
Страница 26: ......
Страница 27: ... Chapter 2 Recommended Installation Sequence Checklist Chapter 2 Recommended Installation Sequence Checklist ...
Страница 28: ......
Страница 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Страница 32: ......
Страница 52: ......
Страница 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Страница 54: ......
Страница 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Страница 124: ......
Страница 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Страница 136: ......
Страница 142: ......
Страница 143: ... Chapter 7 Chemical Delivery and Pumping Station Chapter 7 Chemical Delivery and Pumping Station ...
Страница 144: ......
Страница 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Страница 152: ......
Страница 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Страница 164: ......
Страница 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Страница 168: ......
Страница 174: ......
Страница 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Страница 176: ......
Страница 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Страница 184: ......
Страница 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Страница 192: ......
Страница 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Страница 206: ......
Страница 226: ......
Страница 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Страница 250: ......
Страница 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Страница 254: ......
Страница 258: ......
Страница 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Страница 260: ......
Страница 264: ......
Страница 265: ... Chapter 19 Trades Chapter 19 Trades ...
Страница 266: ......
Страница 270: ......
Страница 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Страница 272: ......
Страница 282: ......
Страница 283: ... Chapter 21 Pneumatic and Hydraulic Connections Chapter 21 Pneumatic and Hydraulic Connections ...
Страница 284: ......
Страница 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Страница 294: ......
Страница 320: ......