Chapter 19 Trades
This section is intended to help you get the most from Electrical and Plumbing contractors that you may
have involved in the project. The following concepts are especially helpful if this is the first FreeStyler®
installation that they have performed.
Note:
However, please keep in mind that even if you are working with solid veterans in our industry,
good coordination can make the difference between an efficient successful installation and
a delayed opening of the site.
Required Man Hours
A FreeStyler® system will typically require between 30 and 40 man/hours to complete the electrical
installation, and about half that for plumbing. This time estimate assumes that the main supply
lines to the building are in place.
Note:
If you have just one electrician, for example, assume that he will require between three and
five days to complete the work, depending upon hours worked per day. Please keep this in
mind as you coordinate your project resource schedule.
Scope of Work
It is good practice to provide your Electrician and Plumber a “Scope of Work” prior to beginning
the installation and is often necessary when hiring skilled trade professionals.
If you do not have a scope of work outlined, you can contact your Belanger® Representative for a
sample scope of work for electrical and plumbing system requirements.
Note:
We also recommend having the Electrician and Plumber coordinate their efforts, to prevent
time delays or additional labor costs caused by having both trades trying to perform their
work in the same area at the same time.
Electrical Coordination Meeting
•
Get the Electrician started as soon as possible
•
As soon as the initial items are in place, do a walk-thru with the Electrician,
pointing out equipment requirements & site specifications
•
Make sure the Electrician is familiar with our terminology
•
Provide the Electrician with the Schematic, Conduit Drawing, and Wire Labels
•
Make this manual available to the Electrician
•
Thoroughly discuss site-specific requirements
•
Thoroughly discuss installation material selections (PVC in the bay, thin wall in
the back room, etc.)
•
Discuss who is responsible for final terminations
•
Include the Electrician in the initial startup of the system
Содержание FreeStyler
Страница 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Страница 14: ......
Страница 26: ......
Страница 27: ... Chapter 2 Recommended Installation Sequence Checklist Chapter 2 Recommended Installation Sequence Checklist ...
Страница 28: ......
Страница 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Страница 32: ......
Страница 52: ......
Страница 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Страница 54: ......
Страница 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Страница 124: ......
Страница 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Страница 136: ......
Страница 142: ......
Страница 143: ... Chapter 7 Chemical Delivery and Pumping Station Chapter 7 Chemical Delivery and Pumping Station ...
Страница 144: ......
Страница 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Страница 152: ......
Страница 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Страница 164: ......
Страница 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Страница 168: ......
Страница 174: ......
Страница 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Страница 176: ......
Страница 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Страница 184: ......
Страница 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Страница 192: ......
Страница 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Страница 206: ......
Страница 226: ......
Страница 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Страница 250: ......
Страница 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Страница 254: ......
Страница 258: ......
Страница 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Страница 260: ......
Страница 264: ......
Страница 265: ... Chapter 19 Trades Chapter 19 Trades ...
Страница 266: ......
Страница 270: ......
Страница 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Страница 272: ......
Страница 282: ......
Страница 283: ... Chapter 21 Pneumatic and Hydraulic Connections Chapter 21 Pneumatic and Hydraulic Connections ...
Страница 284: ......
Страница 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Страница 294: ......
Страница 320: ......
Страница 321: ......