EN
Installation and operating manual
DRYPOINT
®
M eco control
25
4.4. Opening the control unit
For the electrical connection of the 4 ... 20 mA interfaces and/or the alarm contact, the housing of the control unit must
be opened. Loosen the 4 housing screws, using a 2 mm Allen key to perform this task. Cable routing is executed via the
provided armoured conduit fitting (4) or (5).
4
5
2 mm (0.08‘‘)
The hood of the control unit can subsequently be lifted off. Hereby ensure that the ribbon cable (3) will not be crushed or
torn off.
X4.5
X4.4
X4.3
X4.2
X4.1
3
2
1
X4.5
X4.4
X4.3
X4.2
X4.1