3.3. Bypass line (optional)
We recommend installing a bypass line around the plant, so that the downstream compressed air system is
supplied with compressed air while maintenance work is carried out on the plant.
3.4. Connection to compressed air system
Connect the wet gas inlet and the dry gas outlet of the plant to the respective pipes. Check all screw fittings for
proper fixture.
3.4.1.
Compressed air quality
The maximum permissible residual oil content in the compressed air upstream of the plant is 3 mg/m
3
. If the
residual oil content is higher than this value, install an additional prefilter.
If oil-free compressed air is required, install an oil vapour absorber downstream of the plant.
To achieve sterile compressed air, install a high-performance sterile filter downstream of the plant.
3.5. Intermittent operation
If the adsorption dryer is to be run in intermittent operating mode, install it as shown in figure "Intermittent
operation" as follows: Compressor (A) – plant (B) – storage vessel (C).
M
PS
B
C
A
Ensure that the plant is protected against air counterflow!
Содержание DRYPOINT AC 410
Страница 2: ...Installation and operating manual EN 2 DRYPOINT AC 410 495 DRYPOINT AC 410 495 MS ...
Страница 52: ...Installation and operating manual EN 52 DRYPOINT AC 410 495 DRYPOINT AC 410 495 MS ...
Страница 55: ...EN Installation and operating manual DRYPOINT AC 410 495 DRYPOINT AC 410 495 MS 55 ...