7.2 Connection work
For connection work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
• Stripping tool
• Crimping tool for wire-end ferrules
• Screwdriver - cross-head size
2.5 mm (0.09")
•
Screwdriver - flat-blade
size 2.5 mm (0.09")
• 3-wire cable for voltage supply
230 V
• 2-wire cable for voltage supply 24 V
• 2-wire cable for external test
• 2/3-wire cable for potential-free
contact
(depending on the application)
• Wire end ferrules
Always to be worn:
Preparatory tasks
1.
Assembly must have been completed.
2.
Protect the cables for the voltage supply of the
BEKOMAT
®
in accordance with the specifications in the
technical data.
AC = 1 A (time-lag) recommended
DC = 1 A (time-lag) prescribed
3.
In the case of AC voltage supply an accessible circuit breaker (e.g. power plug or switch) that shuts off all
energised conductors must be installed close to the unit.
7.2.1 Voltage supply connection
7.2.1.1 Power control board AC
Illustration
Description / explanation
2
4
5
6
7
4. Loosen the 4 pan-head screws
[2]
in the top cover
and unscrew the components of the cable gland
[4, 5, 6, 7]
.
Original installation and operation manual
BEKOMAT
®
16 CO
25 | 60
Содержание BEKOMAT 16 CO
Страница 1: ...EN BEKOMAT 16 CO 01 3582 Original installation and operation manual BM16CO ...
Страница 55: ...Original installation and operation manual BEKOMAT 16 CO 55 60 ...
Страница 58: ...BEKOMAT 16 CO Original installation and operation manual 58 60 ...
Страница 59: ...Original installation and operation manual BEKOMAT 16 CO 59 60 ...