PN B10093AE
4-1
CHAPTER 4
Care and Maintenance
Introduction
This section describes routine care and maintenance procedures that you should perform regularly or as
required. For maintenance not covered in this manual, contact Beckman Field Service.
*
Refer to the
applicable rotor manual and
Rotors and Tubes for J Series Centrifuges
(publication JR-IM) for
instructions on the care of rotors and accessories.
NOTE
It is your responsibility to decontaminate the instrument, as well as any rotors and/or accessories,
before requesting service by Beckman Coulter Field Service.
WARNING
Any maintenance procedure or servicing of this equipment that requires removal
of any covers can expose parts which involve the risk of electric shock or personal
injury. Make sure that the power switch is off (O) and the centrifuge is
disconnected from the main power source by removing the Mains (power) plug
from the outlet receptacle, and refer such servicing to qualified service personnel.
WARNING
Do not use alcohol or other flammable substances in or near operating
centrifuges.
Maintenance
Perform the following procedures regularly to ensure continued performance and long service life
of the centrifuge.
1
Inspect the centrifuge chamber for accumulations of sample, dust, or glass particles from
broken sample tubes.
a.
Clean as required (see
below).
2
Check the air filter on the back panel for obstructions.
a.
Keep vents clear and clean.
* In the United States, call 1-800-742-2345. Outside the U.S., contact your local Beckman Coulter office or visit us at
www.beckman.com.
Содержание Avanti J-26S XPI
Страница 4: ...PN B10093AE iv Revision History ...
Страница 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Страница 14: ...xiv Illustrations ...
Страница 16: ...xvi Tables ...
Страница 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Страница 36: ...PN B10093AE 1 16 Description Available Rotors ...
Страница 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Страница 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Страница 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Страница 87: ......