Commissioning
EL37x2
75
Version: 3.5
Fig. 79: Sample program with variables after a compile process (without variable integration)
The control program is now created as a project folder, followed by the compile process:
Fig. 80: Start program compilation
The following variables, identified in the ST/ PLC program with "AT%", are then available in under
"Assignments" in the project folder explorer:
Assigning variables
Via the menu of an instance - variables in the "PLC” context, use the "Modify Link…" option to open a
window for selecting a suitable process object (PDO) for linking:
Содержание EL3702
Страница 1: ...Documentation EL37x2 2 channel Analog Input Terminals with oversampling 3 5 2017 06 23 Version Date...
Страница 2: ......
Страница 6: ...Table of contents EL37x2 6 Version 3 5...
Страница 83: ...Commissioning EL37x2 83 Version 3 5 Fig 92 Incorrect driver settings for the Ethernet port...
Страница 142: ...Commissioning EL37x2 142 Version 3 5 Fig 184 Process data tab SM0 EL37x2...
Страница 143: ...Commissioning EL37x2 143 Version 3 5 Fig 185 Process data tab SM1 EL37x2...
Страница 150: ...Commissioning EL37x2 150 Version 3 5 Fig 193 Process Data tab adaptation of process data in SM0...