Mounting and wiring
EL37x2
35
Version: 3.5
Assembly
Fig. 26: Attaching on mounting rail
The Bus Coupler and Bus Terminals are attached to commercially available 35 mm mounting rails (DIN rails
according to EN 60715) by applying slight pressure:
1. First attach the Fieldbus Coupler to the mounting rail.
2. The Bus Terminals are now attached on the right-hand side of the Fieldbus Coupler. Join the compo-
nents with tongue and groove and push the terminals against the mounting rail, until the lock clicks
onto the mounting rail.
If the Terminals are clipped onto the mounting rail first and then pushed together without tongue and
groove, the connection will not be operational! When correctly assembled, no significant gap should
be visible between the housings.
Note
Fixing of mounting rails
The locking mechanism of the terminals and couplers extends to the profile of the mounting
rail. At the installation, the locking mechanism of the components must not come into con-
flict with the fixing bolts of the mounting rail. To mount the mounting rails with a height of
7.5 mm under the terminals and couplers, you should use flat mounting connections (e.g.
countersunk screws or blind rivets).
Содержание EL3702
Страница 1: ...Documentation EL37x2 2 channel Analog Input Terminals with oversampling 3 5 2017 06 23 Version Date...
Страница 2: ......
Страница 6: ...Table of contents EL37x2 6 Version 3 5...
Страница 83: ...Commissioning EL37x2 83 Version 3 5 Fig 92 Incorrect driver settings for the Ethernet port...
Страница 142: ...Commissioning EL37x2 142 Version 3 5 Fig 184 Process data tab SM0 EL37x2...
Страница 143: ...Commissioning EL37x2 143 Version 3 5 Fig 185 Process data tab SM1 EL37x2...
Страница 150: ...Commissioning EL37x2 150 Version 3 5 Fig 193 Process Data tab adaptation of process data in SM0...