Commissioning
EL34xx
74
Version: 1.5
Fig. 58: Application of a "Goto Link" variable, using "MAIN.bEL1004_Ch4" as a sample
The process of assigning variables to the PDO is completed via the menu selection "Actions" → "Generate
Mappings”, key Ctrl+M or by clicking on the symbol
in the menu.
This can be visualized in the configuration:
The process of creating links can also take place in the opposite direction, i.e. starting with individual PDOs
to variable. However, in this example it would then not be possible to select all output bits for the EL2008,
since the terminal only makes individual digital outputs available. If a terminal has a byte, word, integer or
similar PDO, it is possible to allocate this a set of bit-standardised variables (type "BOOL"). Here, too, a
"Goto Link Variable” from the context menu of a PDO can be executed in the other direction, so that the
respective PLC instance can then be selected.
Activation of the configuration
The allocation of PDO to PLC variables has now established the connection from the controller to the inputs
and outputs of the terminals. The configuration can now be activated. First, the configuration can be verified
via
(or via "Actions" → "Check Configuration”). If no error is present, the configuration can be
activated via
(or via "Actions" → "Activate Configuration…") to transfer the System Manager settings
to the runtime system. Confirm the messages "Old configurations are overwritten!" and "Restart TwinCAT
system in Run mode" with "OK".
A few seconds later the real-time status
is displayed at the bottom right in the System Manager.
The PLC system can then be started as described below.
Starting the controller
Starting from a remote system, the PLC control has to be linked with the Embedded PC over Ethernet via
"Online" → “Choose Run-Time System…":
Содержание EL34 Series
Страница 1: ...Documentation EL34xx 3 phase energy and power measurement terminals 1 5 2019 09 05 Version Date ...
Страница 2: ......
Страница 52: ...Mounting and wiring EL34xx 52 Version 1 5 Fig 35 Other installation positions ...
Страница 58: ...Mounting and wiring EL34xx 58 Version 1 5 EL3453 LEDs and connection Fig 40 EL3453 LED s ...
Страница 92: ...Commissioning EL34xx 92 Version 1 5 Fig 86 Incorrect driver settings for the Ethernet port ...
Страница 103: ...Commissioning EL34xx 103 Version 1 5 Fig 105 EtherCAT terminal in the TwinCAT tree left TwinCAT 2 right TwinCAT 3 ...
Страница 130: ...Commissioning EL34xx 130 Version 1 5 Fig 147 Process Data tab SM3 EL3443 ...
Страница 131: ...Commissioning EL34xx 131 Version 1 5 Fig 148 Process Data tab SM3 EL3453 ...
Страница 132: ...Commissioning EL34xx 132 Version 1 5 Fig 149 Process Data tab SM3 EL3483 ...
Страница 160: ...Commissioning EL34xx 160 Version 1 5 Index F802 PMX Guard Settings ...
Страница 183: ...Commissioning EL34xx 183 Version 1 5 Index F802 PMX Guard Settings ...
Страница 205: ...Commissioning EL34xx 205 Version 1 5 Index 1C13 TxPDO assign ...
Страница 214: ...Commissioning EL34xx 214 Version 1 5 Index F802 PMX Guard Settings ...
Страница 242: ...Commissioning EL34xx 242 Version 1 5 Index 1C13 TxPDO assign ...
Страница 259: ...Application examples EL34xx 259 Version 1 5 7 Application examples ...