Operation
EK1960
69
Version: 1.3.1
4.3.3.13
Order of the TwinSAFE groups
The order of the groups can be changed, in order to realize a defined processing sequence of the safety
application.
To this end, select the entry
Edit TwinSAFE Group Order
via the node menu of the safety project node. A
dialog opens, in which the order of the groups can be changed. The individual groups do not necessarily
have to be numbered in consecutive ascending order. The numbering can contain gaps.
Fig. 67: Context menu Edit TwinSAFE Group Order
The current group order is shown in the column
Current Value
. The new order is specified by entering a
value in the column
New Value,
followed by
OK
.
Fig. 68: Dialog Change Execution Order of TwinSAFE Groups
4.3.3.14
Command line
The
command line
below the SAL worksheet can be used to enter commands for executing functions.
Содержание EK1960 Series
Страница 1: ...Operating Instructions for EK1960 TwinSAFE Compact Controller 1 3 1 2019 01 28 Version Date...
Страница 2: ......
Страница 6: ...Table of contents EK1960 6 Version 1 3 1...
Страница 58: ...Operation EK1960 58 Version 1 3 1 Fig 51 Safety parameters of the input modules...
Страница 102: ...Operation EK1960 102 Version 1 3 1 Fig 131 Group Status Online ERROR Fig 132 Group Status Online STOP...
Страница 140: ...Appendix EK1960 140 Version 1 3 1 5 2 Certificates...