Operation
EK1960
119
Version: 1.3.1
Fig. 165: Multiple Download - Final Verification
To activate the safety projects, enter the password for the current user again and confirm with the
Next
button.
Fig. 166: Multiple Download - Activation
The Result dialog lists all safety projects with the status
Activated
and
Downloaded
. Click the
Finish
button to
finish the multiple download.
Содержание EK1960 Series
Страница 1: ...Operating Instructions for EK1960 TwinSAFE Compact Controller 1 3 1 2019 01 28 Version Date...
Страница 2: ......
Страница 6: ...Table of contents EK1960 6 Version 1 3 1...
Страница 58: ...Operation EK1960 58 Version 1 3 1 Fig 51 Safety parameters of the input modules...
Страница 102: ...Operation EK1960 102 Version 1 3 1 Fig 131 Group Status Online ERROR Fig 132 Group Status Online STOP...
Страница 140: ...Appendix EK1960 140 Version 1 3 1 5 2 Certificates...