Commissioning
CX20x2
39
Version: 1.7
6.4
Switching on
Please ensure that the Embedded PC is fully configured before switching on the Embedded PC.
Switch on the Embedded PC as follows:
1. Ensure that all extension, system and fieldbus modules are connected correctly.
2. Check whether the Embedded PC is mounted securely on the DIN rail and all required Bus Terminals
are connected.
3. Only connect the external power supply for the power supply unit after having done so.
ð
The Embedded PC starts automatically as soon as you connect the external power supply for the power
supply unit. The pre-installed operating system is started and all connected extension, system and
fieldbus modules are configured.
6.5
Switching off
NOTE
Loss of data
If the Embedded PC is switched off during operation, data on the CFast card or other hard disks may be
lost.
• Do not disconnect the Embedded PC from the power supply during operation.
Switch off the Embedded PC as follows:
1. Stop all running programs properly, e.g. the control software on the Embedded PC.
2. Shut down the operating system.
3. Switch off the external power supply for the power supply unit last so that the Embedded PC is switched
off.
Содержание CX20 2 Series
Страница 1: ...Manual EN CX20x2 Embedded PC 6 30 2020 Version 1 7...
Страница 2: ......
Страница 15: ...Product overview CX20x2 15 Version 1 7 4 3 Module overview...
Страница 76: ......